Laserfiche WebLink
Maps: The attached maps show the release areas being applied for. Map R-1 shows Phase 2 <br />areas and Map R-2 shows Phase 3 areas. <br />Dates Reclamation Work Performed: <br />Phase 2, Area 1: <br />Topsoiled in: 2004, 2005 and 2006 <br />Seeded in 2004, 2005 and 2007. <br />Phase 2, Area 2: <br />Topsoiled in: 2001, 2006 and 2007 <br />Seeded in 2001, 2002 and 2007. <br />Phase 3, Area 1: <br />Topsoiled in: 1994, 1995, 1996, 1997, 1998 <br />Seeded in : 1994, 1995, 1996, 1997, 1998 <br />Phase 3, Area 2: <br />Topsoiled in: 1994, 1995, 1996 <br />Seeded in 1994, 1995, 1996. <br />Phase 3, Area 3: <br />Topsoiled in: 1995 <br />Seeded in 1995 <br />Phase 3, Area 4: <br />Topsoiled in: 1994, 1995 <br />Seeded in 1994,1995,1996. <br />Description of Bond Release Amount: A bond reduction is to be calculated by the DRMS <br />based on revegetation success in Phase 2 and Phase 3 areas. The enclosed Maps R-1 and R-2 <br />shows the location of each Phase 2 and Phase 3 areas. <br />In accordance with the approved TR-57, revegetation of phase 3 bond release areas is now <br />compared to agreed upon reference areas. These areas can be seen in the 1310-Logic reports in <br />Appendix B. Phase 2 irrigated pasture areas will be judged using the approved technical <br />standard of 90% of 71.8% cover for success. <br />SL-12 COMPARISON 16MARI Lwpd 9