Laserfiche WebLink
4 <br />Oakridge Energy, Inc. <br />M <br />November 28, 2006 <br />Page 2 <br />Location Drainage or erosional Needed repairs/work <br /> feature discussed during inspection <br />North Pit Haul Road ditch <br />south of the new double Sediment filling ditch Clean sediment out of ditch <br />culvert <br />Diversion at head of <br />riprapped section of Carbon <br />Silt fence diversion Regrade berm to direct flow <br /> <br />Junction Canyon ditch needing replacement east of Permanently Reclaimed <br />Spoil Area <br /> Submit a revision to the permit <br /> Stilling basin at base of that demonstrates the base of <br />South half of North Pit reclaimed North Pit the reclaimed slope acts as a <br /> (sediment sump stilling basin that adequately <br /> construction) controls sediment from a 10- <br /> ear storm event <br />In addition to the above-referenced work, the old equipment in the equipment storage <br />yard will need to be removed before the land where the equipment is located can be <br />approved for Phase I bond release. Page 10 of the inspection report contains a list of the <br />equipment. <br />If you have any questions, please do not hesitate to call me. <br />Sincerely, <br /> <br />Tom Kaldenbach <br />Environmental Protection Specialist <br />cc: Mike Savage, Savage and Savage Environmental <br />Dan Hernandez, CDRMS