My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-01-05_REVISION - C1992080
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992080
>
2007-01-05_REVISION - C1992080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:16:33 PM
Creation date
3/17/2011 9:38:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080
IBM Index Class Name
REVISION
Doc Date
1/5/2007
Doc Name
Adequacy Review
From
DRMS
To
Michael Savage
Type & Sequence
SL3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />January 5, 2007 <br />Mr. Michael S. Savage <br />4610 Haystack Drive <br />Windsor, CO 80550 <br />Re: Carbon Junction Mine, DMG Permit C-92-080 <br />Bond Release Application SL-3 <br />Technical Adequacy Review <br />Dear Mr. Savage: <br />COLORADO <br />D I V I S ION OF <br />RECLAMATION <br />MINING <br />SAFETY <br />Bill Owens <br />Governor <br />Russell George <br />Executive Director <br />Ronald W. Cattany <br />Division Director <br />Natural Resource Trustee <br />The Division has completed its preliminary review of the SL-3 bond release application. <br />We have the following comments. <br />1. Please submit the map referred to on page 1 of the bond release application as <br />Carbon Junction Mine: Final Reclamation Phase I Bond Release Areas. It was <br />not included with the application. <br />2. Please submit a P.E.-certified as-built design for the reconstructed Carbon <br />Junction channel, including the two new culverts. <br />3. The equipment in the storage yard will need, to be removed before the land where <br />the equipment is located can be approved for Phase I bond release. Please advise <br />us of the schedule for removing the equipment. <br />4. Now that the North Pit has been backfilled and graded, it would be appropriate to <br />re-evaluate the designs for the planned lower sump and upper sump #2. Please <br />contact us so that we may discuss those designs. <br />After the preceding four items are resolved, the dollar amount eligible for bond release in <br />SL-3 can be established. <br />Sincerely, <br /> <br />Tom Kaldenbach <br />cc: Daniel I. Hernandez, CDMG <br />Sandra Pautsky, Oakridge Energy, Inc. <br />Office of Office of <br />Mined Land Reclamation Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.