Laserfiche WebLink
... _ .:.. .._...._. _ <br />R11 <br />OADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Fuel Tanker, 6x4, 210 HP $79.88 1 $79.88 $79.88 <br />-tube Truck, 6x4, 210 HP $95.16 1 $95.16 $95.16 <br />-Flatbed Truck, 6x4, 45K GVW $103.01 1 $103.01 $103.01 <br />-Light Duty Pickup, 4x4, 1 T. Crew $56.76 1 $56.76 $56.76 <br />-Water Tanker, 2,500 Gal. $60.90 1 $60.90 $60.90 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $395.71 $395.71 <br />1 006PMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region : Craig <br />Transportation Cycle Time : Non- Total one-way travel distance : 35.0 miles <br />Roadable Roadable Average travel speed : 35.0 mph <br />Haul time (hours) = 1.00 1.00 Total non-roadable mob/demob cost " : $21,958.03 <br />Return time (hours) = 1.00 1.00 • two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost -: $791.43 <br />Unloading time (hours) = 0.50 NA •• one round trip, no haul rig <br />Subtotals = 3.00 2.00 <br />JOB TIME AND COST Total job time : 6.00 hours <br /> Total job cost : $2Z749