My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-16_REVISION - C1982057
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982057
>
2011-03-16_REVISION - C1982057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:31:48 PM
Creation date
3/16/2011 1:20:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
REVISION
Doc Date
3/16/2011
Doc Name
Reclamation Cost Estimate (Memo)
From
Jim Stark
To
Susan Burgmaier
Type & Sequence
SL3
Email Name
SLB
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task #: 012 State : Colorado <br />Date : 03/15/2010 County: Routt <br />User : JRS Site : Seneca li-W <br />)OZER WORK ?O <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Partial Phase I Bond Release SL-02 <br />Task description : Doze Adjacent Sage Creek/Wolf Creek Pit Spoil Ridges <br />HOURLY EQUIPMENT COST <br />Basic machine: Cat D1 1R - 11U (2005) Horsepower : 850 <br />Blade type : Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />Cost Breakdown : <br />MATERIAL QUANTITIES <br />Initial <br />volume : 509,300 <br /> Data source : (CRG) <br /> Utilization % <br />Ownership cost/hour : $174.21 NA <br />Operating costlhour : $209.76 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $422.51 Total fleet cost/hour : $1,690.03 <br /> <br />Swell Loose <br />LCY factor : NA volume : 509,300 LCY <br />Source of estimated volume : Division Estimate <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 250 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted hourly production : 1,264.9 LCY/hr Dozing method : 1.10 (50.0 sl) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shif1day) <br />Loose stockpile Spoil pile : 0.90 (ssd-fc) <br /> Push gradient : 1.33 (Cat HB) <br />Average push gradient : 15.00 % Ineg) Altitude : 0.93 (Cat HB) <br />Average site altitude : 8,000 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SUM <br />Material weight : Z550 Ibs/LCY Net correction : 0.82 <br />Weight description <br />Sandstone <br />JOB TIME AND COST <br />Adjusted unit production : 1042.48 LCY/hr <br />Adjusted fleet production : 4,169.92 LCY/hr <br />Fleet size : 4 Dozer(s) Total job time <br />Unit cost : $0.405 /LCY Total job cost <br />Perrnit/job# : C-1982-057 <br />Abbreviation :none <br />Filename :C057-012 <br />122.14 Hours <br />$206,415 <br />r; µ
The URL can be used to link to this page
Your browser does not support the video tag.