My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-16_PERMIT FILE - C1996083A (23)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2010-11-16_PERMIT FILE - C1996083A (23)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:27:00 PM
Creation date
3/16/2011 8:54:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
11/16/2010
Doc Name
Pages 2.05-1 to 2.05-83
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 2.05.4 <br />excavated and lined. The fill will be placed at or above optimum moisture <br />content and compacted to a density of at least 85% of the maximum modified <br />Proctor density. The light use road will be reclaimed when the vent shaft in <br />no longer required. Since topsoil was not salvaged from the light use road or <br />pad the road bed and pad will be ripped, plowed or scarified prior to seeding <br />to provide a suitable seed bed. The vent shaft pad and light use road <br />facilities are presented on Map 35 (Volume II) which also presents the <br />postmining topography of the pad and light use road. <br />New light use roads will be reclaimed. Reclamation of the upgraded and <br />refurbished light use roads may involve narrowing the roads so they are <br />compatible with the postmining land use of rangeland and wildlife habitat <br />since roads are necessary to manage both land uses and a light use road <br />network was existing on the property prior to mining. <br />The drill pads for the Gob Ventilation Bore Holes will be reclaimed when the <br />GVBs are no longer required. If topsoil is not salvaged in adequate quantity <br />to provide a suitable seed bed, one will be developed as explained in the <br />paragraph above. Reclaimed light use roads and drill pads will be graded to <br />approximate original contour. <br />(2)(d) A plan for the removal and storage of topsoil is presented in Section <br />2.05.3(5). During reclamation operations topsoil will be placed on regraded <br />areas in an approximate uniform, stable thickness. Map No. 32, Topsoil <br />Distribution Plan, shows the location of the topsoil stockpiles and the areas <br />where and thickness which topsoil will be spread. <br />PR -12 2.05-65- 02/10 <br />/9 PPAovsD <br />It/l6� /a <br />
The URL can be used to link to this page
Your browser does not support the video tag.