Laserfiche WebLink
TABLE OF CONTENTS <br />VOLUME VII - GEOTECHNICAL STUDIES <br />1. Introduction <br />2. Preliminary Geotechnical Engineering Study - July 10, 1996 <br />3. Additional Geotechnical Study - Evaluation of Reclaimed Slopes - October 10, 1996 <br />4. Additional Stability Analyses - Road Cuts and Topsoil Pile - January 7, 1996 <br />5. Geotechnical Laboratory Testing - Proposed Gob Pile - January 7, 1997 <br />6. Maps VII -1 & 2 Section & Bore Hole Locations <br />7. Expansive Soil Evaluation - Reclaimed Fill Slopes - January 31, 1997 <br />8. Additional Geotechnical Investigation - Coal Mine Waste Bank - February 12, 1997 <br />• 9. Geotechnical Engineering Study, Sediment Pond B, Lambert and Associates- <br />January 26, 2000.Geotechnical Engineer Report - Slope Stability Analysis - PR -03 - <br />Terracon - 6/2/99 <br />10. Geotechnical Engineering Study, Coal Preparation Facility, August 11, 2003 <br />Geotechnical Engineering Study, B -Seam Portal Bench, July 30, 2003 <br />Slope Stability Analyses, B -Seam Portal & Stockpile, April 7, 2003 <br />11. Temporary Rock Catchment Design dated February 12, 2004 by Yeh and <br />Associates, Inc. <br />12. Collin L. Stewart letter report dated March 9, 2004 <br />Yeh and Associates, Inc. letter report dated March 11, 2004 <br />PR -12 A 06/10 <br />,9 p�RovED <br />