Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 255 State : Permit/job# : C -1996 -083 <br />Date <br />User <br />05/05/2010 <br />JRS <br />County : Delta <br />Site :Bowie No. 2 Mine <br />Abbreviation : none <br />Filename : C083 -255 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Permit Revision 12 _ <br />Task description : Replace Topsoil from Stockpile to Light -Use Roads <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower: _ 4 <br />Blade type Semi - Universal <br />Attachment no. 1 : ROPS Cab Shift basis : -- I per day <br />Attachment no. 2 : -shank ripper <br />Average push distance : 150 feet <br />Unadjusted hourly production : 910.5 LCY /hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient: 5.00 % (I <br />Average site altitude : 8,100 feet <br />Material weight: 2,550 Ibs /LCY <br />Weight description <br />Earth - Dry packed <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) <br />Operator skill : <br />0.75 <br />(a <br />Data source: <br />( CRG) <br />(Cat HB) <br />Dozing method : <br />1.00 <br />Utilization % <br />Visibility: <br />Cost Breakdown : <br />Ownership cost/hour : <br />$67.77 <br />NA <br />(1shi <br />Spoil pile: <br />Operating cost/hour : <br />$95.29 <br />100 <br />0.90 <br />(C at HB) <br />Ripper op. cost/hour : <br />$0.00 <br />0 <br />Material weight: <br />0.90 <br />Operator cost/hour : <br />$38.54 <br />NA <br />(S /SU /U) <br />Net correction : <br />Total unit cost/hour: <br />$201.60 <br />Total fleet cost/hour : <br />$201.60 <br />MATERIAL QUANTITIES <br />Adjusted fleet production : <br />350.93 <br />LCY /hr <br />Initial <br />Swell <br />Loose <br />volume: 3,140 <br />BCY factor : <br />1.250 <br />volume: 3,925 <br />LCY <br />Source of estimated <br />volume : D /v /s /on Estimate <br />Source of estimated swell factor CAT Handbook <br />HOURLY PRODUCTION <br />Job Condition Correction Factors <br />Source <br />Average push distance : 150 feet <br />Unadjusted hourly production : 910.5 LCY /hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient: 5.00 % (I <br />Average site altitude : 8,100 feet <br />Material weight: 2,550 Ibs /LCY <br />Weight description <br />Earth - Dry packed <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) <br />Operator skill : <br />0.75 <br />(a <br />Material consistency : <br />1.00 <br />(Cat HB) <br />Dozing method : <br />1.00 <br />(gen _ <br />Visibility: <br />1.00 <br />(avg.) <br />Job efficiency: <br />0.83 <br />(1shi <br />Spoil pile: <br />0.80 <br />( fnd -ro <br />Push gradient: <br />0.90 <br />(C at HB) <br />Altitude : <br />0.95 <br />(Cat HB) <br />Material weight: <br />0.90 <br />(Cat HB <br />Blade type : <br />1.00 <br />(S /SU /U) <br />Net correction : <br />0.39 <br />Adjusted unit production : <br />350.93 <br />LCY /hr <br />Adjusted fleet production : <br />350.93 <br />LCY /hr <br />Total job time : 11.18 Hours <br />Unit cost: $0.574 /LCY Total job cost: $2,255. <br />