My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-16_PERMIT FILE - C1996083A (28)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2010-11-16_PERMIT FILE - C1996083A (28)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:27:00 PM
Creation date
3/16/2011 8:24:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
11/16/2010
Section_Exhibit Name
Volume IIIA Exhibit 15 Subsidence Prediction
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Subsidence Handbook Volume III, Exhibit 15 <br />TRANSMISSION LINE AND TRANSMISSION TOWERS <br />Introduction <br />The Western Area Power Administration Curecanti -Rifle transmission line and transmission <br />towers are located west of Terror Creek. <br />Worst -Case Damage <br />Tilt of the ground surface caused by subsidence could affect the transmission towers and <br />thus affect the integrity of this important transmission line. If the ground slope is such that <br />after tilting the center of gravity of the tilted structure falls outside of the base area, it will <br />topple but that is not likely. <br />Pre - Damage Monitoring <br />No pre- damage monitoring will be performed. The Applicant will assume the transmission <br />line towers were constructed with no tilt and the transmission line towers have virtually zero <br />tilt after settling. <br />• <br />Post - Damage Monitoring <br />Post - Damage monitoring would involve surveying the level of the transmission tower <br />footings to determine the tilt angle of the transmission line towers. <br />Mining Techniques <br />Mining near or under transmission line towers will be limited so no subsidence will occur. <br />Repair Procedures <br />Shims would be placed under the tower legs to eliminate the tilt of the transmission <br />towers. <br />• <br />TR -65 46 02/10 <br />APPROVCD <br />` 11elJ6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.