Laserfiche WebLink
Subsidence Handbook Volume III, Exhibit 15 • <br />Repair Procedure -Short-Term <br />Undeveloped Spring <br />1. Locate flow interrupting crack. <br />2. Excavate crack. <br />3. Install pond lining per manufacturer's recommendations. <br />4. Backfill with porous gravels. <br />5. Cover with native soils. <br />6. Revegetate disturbed area with DMG approved seed mixture. <br />Material Required <br />Pond Liner Material -Local suppliers (24-hour delivery). No pond liner <br />required on mine site. <br />Randall Industries, Inc., 745 Struthers Ave, Grand Junction, CO 81501, <br />phone 242-3787 • <br />Significant Developed Springs <br />1. Locate flow interrupting crack. <br />2. Excavate groundwater source. <br />3. Add additional perforated pipe. <br />4. Backfill with porous gravel filter material. <br />5. Cover with native soils. <br />6. Revegetate disturbed areas with DMG approved permanent seed mixture. <br />Material Required <br />PVC Pipe -Local suppliers (24-hour delivery). No PVC pipe required on <br />mine site. <br />Bollinger & Queen, Rogers Mesa, Hotchkiss, CO 81419, phone 872-3371. <br />Grand Junction Pipe & Supply, 2868 I-70 Business Loop, Grand Junction, • <br />CO 81501, phone 243-4604, fax 241-6622 <br />PR-04 40 10/00 <br />