My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-09_INSPECTION - M2000067
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2000067
>
2011-03-09_INSPECTION - M2000067
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:31:35 PM
Creation date
3/15/2011 8:51:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000067
IBM Index Class Name
INSPECTION
Doc Date
3/9/2011
Doc Name
Inspection report
From
DRMS
To
Beavers Construction CO./High Mesa Gravel
Inspection Date
3/1/2011
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name: DRMS <br />02a State :Colorado <br />0310912011 County :Delta <br />T14AA Site :High Mesa Gravel <br />Permit/job # :M-2000-067 <br />Abbreviation :none <br />Filename : M067-02a <br />Permit or other job action :Final Reclamation Cost Estimate <br />Task description :Replace V of overburden over 18 acres <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />(Equipment Description <br />Scraper work team -Scraper-.Cat 627G w/push-pull <br />-Push dozer:NA <br />Support equipment -Load area : Cat D7R DS Series 11 - 7SU <br />-Dump area :NA <br />----- - <br />Road maintenance -Motor grader: NA <br />-Water truck : NA <br />Cost Bre <br />akdown : Scraper Work Team Support Eq uipment Road Maintenance tquipmem <br /> Scraper Dozer Load area Dump area Grader water truck <br />Import data filename : scraper2 NA dozer NA NA NA <br />% Utilization-machine : 100 NA 50 NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $57.56 NA $43.55 NA NA _NA <br />Operating cost/hour : $144.12 NA $32.48 NA NA NA <br />Ripper op. cost/hour : . NA NA $0.00 NA NA NA <br />Operator cost/hour : $24.98 NA $38.54 NA NA NA <br />Unit subtotals : $226.67 NA $114.56 NA NA NA <br />Number of units : 2 0 1 0 0 0 <br />Group subtotals : Work : $453.33 Support : $114.56 Maintenance : $0.00 <br />Total work team cost/hour : $567.89 <br />MATERIAL QUANTITIES <br />Swell Loose <br />Initial <br />volume : 29,040 LCY factor NA - volume : 29,040 LCY <br />Source of quantity take-off :1 foot over 18 acres - <br />Source of estimated swell factor :NA
The URL can be used to link to this page
Your browser does not support the video tag.