Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task # : <br />Date : <br />User : <br />Agency or organization name : DRMS <br />03a State :Colorado <br />0310912011 County : Delta <br />THM Site :High Mesa Gravel <br />Permit/job # :M-2000-067 <br />Abbreviation :none <br />Filename :M067-03a <br />Permit or other job action :Final Reclamation Cost Estimate <br />Task description :Replace 6" of topsoil over 18 acres <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />scraper WU1n LGaI I ur., <br />-Push dozer <br />Support equipment -Load area <br />-Dumb area <br />ment Description <br />627G w/push-pull <br />D7R DS Series 11- 7SU <br />Road maintenance -Motor grader <br />-Water truck <br />Cost Breakdown : Scraper Work Team <br /> Scraper Dozer <br />import data filename : scraper2 NA <br />% Utilization-machine : 100 NA <br />-Ripper attachment : NA NA <br />Ownerhip cost/hour : $57.56 NA <br />Operating cost/hour : $144.12 NA <br />Ripper op. cost/hour : NA NA <br />Operator cost/hour : $24.98 NA <br />Unit subtotals : $226.67 NA <br />Number of units : 2 0 <br />Group subtotals :I Work : $453.33 <br />Support Equipment <br />Load area Dump area <br />de r NA <br /> NA <br /> NA <br />! <br />55 NA <br />48 NA <br />00 NA <br />54 NA <br />$114.56 NA <br />1 0 <br />Support : $114.56 <br />Road Maintenance Equipment <br />G <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Maintenance : $0.00 <br />Total work team cost/hour : $567.89 <br />MATERIAL QUANTITIES <br />Swell Loose <br />Initial LCY <br />factor : NA volume : 14,520 <br />volume : 14,520 LCY <br />Source of quantity take-off :6" topsoil over 18 acres <br />Source of estimated swell factor : NA