My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-14_REPORT - C1982056 (3)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1982056
>
2011-03-14_REPORT - C1982056 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:31:42 PM
Creation date
3/14/2011 10:51:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Report
Doc Date
3/14/2011
Doc Name
2010 Annual Hydrology Report
From
Twentymile Coal Company
To
DRMS
Annual Report Year
2010
Permit Index Doc Type
Hydrology Report
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
spring of 2011. TCC will be upgrading additional stations in 2011. Additional flow meters may also be added in <br />2011 and 2012. <br />Foidel Creek: Four surface flow monitoring sites on Foidel Creek (in the vicinity of the TCC mine portals and <br />facilities areas) are utilized. Site 800 and site 14 are located upstream of the portal. Site 8 is located a short <br />distance downstream of the portal area and is monitored in conjunction with alluvial well 001-5-5. Site 900 is <br />located further downstream on Foidel above the confluence with Middle Creek. Former site 304 was located <br />further downstream of 900. Site 304 was eliminated in 2003 per TR03-42. <br />Tables 33 through 36 provide summaries of the 2010 Water Year data collected at each site. Tables 33a, 34a, and <br />35a provide POR statistical summaries of collected data at each site. Figures 52 to 59 and 102 to 105 provide <br />graphical representations of water levels and selected water quality parameters recorded at each site. Typical <br />flow patterns were exhibited at these sites with spring runoff periods accounting for the peak flows observed. At <br />all of these sites, the inverse relationship between flow and field conductivity continues to be evident. Water <br />quality parameters for these sites were within previously established ranges. An increase in conductivity at site 8 <br />has been noted over the last two years. This is attributed to increased discharge from Pond D, resulting from <br />overflows from the Area # 1 Pit (via DRMS site 7), which is partially fed by mine water as part of mine <br />dewatering operations for the old WMD and EMD. <br />Fish Creek: Nine surface flow monitoring sites are utilized on Fish Creek. Site 16A replaced site 16 in 2000, <br />and is located upstream of the Fish Creek Borehole discharge site 115. Historical data for site 16 may be found in <br />previous AHRs. Site 307 is located approximately one mile downstream of the Fish Creek Borehole mine <br />dewatering site and is monitored in conjunction with alluvial well 006-AZ-3. Site 302 is located approximately <br />two miles downstream of the Fish Creek Borehole mine dewatering site. Site 305 is located upstream of the Fish <br />Creek Tipple and is monitored in conjunction with alluvial well 008-AU-3. Site 27A is located immediately <br />upstream of the Fish Creek Tipple discharge (a.k.a. CDPS discharge site 62). Site 1003 is located downstream of <br />the Fish Creek Tipple site 62. <br />Monitoring requirements at sites 307 and 305 require monthly water level measurements (March through <br />September), and semi-annual field parameters. However, per PR03-06, site 305 now requires semi-annual water <br />quality testing. <br />Three relatively new surface sites were added in conjunction with the new Fish Creek Alluvium well sites (AVF- <br />13, AVF-14, and AVF-15), in order to evaluate potential subsidence impacts in the area. These are surface sites <br />SW-13, SW-14 (both added in August 2001), and SW-15 (added in June 2002). These sites require quarterly <br />water level measurements (March through September), and semi-annual field parameters and water quality <br />sampling. <br />Tables 37 through 45 provide summaries of the 2010 Water Year data collected at Fish Creek surface flow sites. <br />Tables 37a through 45a provide some historical summaries of collected data at each site for comparison. Figures <br />60 through 91 provide graphical representations of water levels and selected water quality parameters recorded at <br />each site. Again, typical flow patterns were exhibited at these sites with spring runoff periods accounting for the <br />11
The URL can be used to link to this page
Your browser does not support the video tag.