Laserfiche WebLink
Grand Junction Pipe & Supply co. <br />Table 2: Monthly Distribution of Consumptive Losses Associated in Mining Operations <br />Gunnison River Pits <br />Pit No. 1 <br /> Dust Control Dust Control Moisture Retained in <br />Month Site Roads Crusher Operations Mined Product Total <br /> 1 2 3 4 <br />January 0.00 0.00 0.00 0 <br />00 <br />February 0.00 0.00 0.00 . <br />0 <br />00 <br />March 0.00 0.00 0.00 . <br />0 <br />00 <br />April 0.00 0.00 0.00 . <br />0 <br />00 <br />May 0.00 0.00 0.00 . <br />0 <br />00 <br />June 0.34 0.00 0.25 . <br />0 <br />59 <br />July 0.34 0.50 0.25 . <br />1 <br />09 <br />August 0.34 0.00 0.25 . <br />0 <br />59 <br />September 0.00 0.00 0.00 . <br />0 <br />00 <br />October 0.00 0.00 0.00 . <br />0 <br />00 <br />November 0.00 0.00 0.00 . <br />0 <br />00 <br />December 0.00 0.00 0.00 . <br />0.00 <br />Annual Total 1.02 0.50 0.75 2 <br />27 <br />All values in acre f eet . <br />Pit No. 5 <br /> <br />Month Dust Control <br />Site Roads <br />1 Dust Control <br />Crusher Operations <br />2 Moisture Retained in <br />Mined Product <br />3 <br />Total <br />4 <br />January 0.81 0.00 0.28 1 <br />09 <br />February 0.81 0.00 0.28 . <br />1 <br />09 <br />March 0.81 0.50 0.28 . <br />1 <br />59 <br />April 0.81 0.00 0.28 . <br />1 <br />09 <br />May 0.81 0.00 0.28 . <br />1 <br />09 <br />June 0.81 0.00 0.28 . <br />1 <br />09 <br />July 0.00 0.00 .0.0,0 . <br />0 <br />00 <br />August 0.00 0.00 0.00 . <br />0 <br />00 <br />September 0.81 0.50 0.28 . <br />1 <br />59 <br />October 0.81 0.00 0.28 . <br />1 <br />09 <br />November 0.81 0.00 0.28 . <br />1 <br />09 <br />December 0.81 0.00 0.28 . <br />1.09 <br />Annual Total 8.10 1.00 2.80 11 <br />90 <br />All values in acre f eat . <br />(1) Dust control on site roads: <br />Pit No. 1: 5,000 gpd for 22 days per month, or 0.34 ac-ft per month (June through August) <br />Pit No. 5: 12,000 gpd for 22 days per month, or 0.81 ac-ft per month (January through June & September through C <br />(2) Dust control for crusher operations: <br />Pit No. 1: 0.5 ac-ft per month for one month per year (typically July) <br />Pit No. 5: 0.5 ac-ft per month for two months per year (typically March and September) <br />(3) Retained moisture: <br />Pit No. 1: 70,000 tons/year, 72 percent of deposit mined below water table, and 2 percent by weight retained moiStl <br />Pit No. 5: 250,000 tons/year, 76 percent of deposit mined below water table, and 2 percent by weight retained mois <br />(4) Total equals sum of columns 1, 2, and 3 <br />Western Water & Lana, Inc..