Laserfiche WebLink
ADJUSTED COSTS <br /> <br />Depreciation Ownership Costs <br /> <br />CFC <br /> <br />Overhead <br />Over <br />Labor <br />haul <br />Parts Overh <br />Field R <br />Labor aul and Oper <br />epair <br />Parts ating Costs <br /> <br />Fuel <br />NA <br /> <br />Lube <br />NA <br /> <br />Tires <br />NA s <br /> <br />G.E.C. <br />NA <br />Acquisition cost : $15.33 NA NA NA NA NA NA <br />3 NA NA NA NA <br />Econ.life -Dozer and ROPS : $15.33 NA NA $4.86 $11.69 $5.99 $11.3 <br />00 NA NA NA NA <br />-Attachment no. 2 : <br />Annual usage : <br />Double shifts : NA <br />$25.19 <br />$18.89 NA <br />$7.84 <br />$3.92 NA <br />$10.52 <br />$5.26 $0.00 <br />NA <br />NA $0.00 <br />NA <br />NA $0.00 <br />NA <br />NA $0. <br />NA <br />NA NA <br />NA <br />NA NA <br />NA <br />NA NA <br />NA <br />NA NA <br />NA <br />NA <br />Triple shifts : $16.80 $2.61 $3.50 NA NA NA NA NA NA NA NA <br />Mechanic labor-Dozer and ROPS : <br />-Attachment no. 2 : NA <br />NA NA <br />NA NA <br />NA $2.54 <br />$0.00 NA <br />NA $3.13 <br />$0.00 NA <br />NA NA NA NA NA <br /> 79 00 <br />$0 $1 <br />89 <br />el/lube -Dozer and ROPS : <br />F NA NA NA NA NA NA NA $28.59 $5. . . <br />u 00 <br />$0 00 <br />$0 $0.00 $0.00 <br />Attachment no. 2: NA NA NA NA NA NA NA . . <br /> sts <br />ti <br />C <br />O <br />ADJUSTED COST SUBTOTALS Ownership Costs <br />Depreciation CFC Overhead Overhaul <br />Labor Parts Overhaul an <br />Field Repair <br />Labor Parts ng <br />o <br />pera <br />d <br />Fuel Lube Tires G.E.C. <br />Dozer, ROPS and Attachment no. 2 : <br />le shifts : <br />Sin <br />$25.19 $7.84 $10.52 Dozer and ROPS : <br />$2.54 $11.69 $3.13 $11.33 $28.59 0.79 $0.00 $1.89 <br />g <br />Double shifts : <br />Triple shifts : $18.89 <br />$16.80 $3.92 <br />$2.61 $5.26 <br />$3.50 ttachment no. 2: <br />$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br /> <br />HOURLY OPERATOR WAGES Base Fringe F.I.C.A. Unempl. Wk.Comp. Total <br /> Rate Benefits 7.65% 6.20% 10.00% ($/hr) Shift Differential <br />00 <br />$0 <br />D Colorado labor zone <br />Two shift per day average : 2 <br />: $0.15 <br />Dozer operator (< 70hp <br />erator (-70hp <br />r o <br />D $23.67 <br />$23.67 $9.22 <br />$9.22 $1.81 <br />$1.81 $1.47 <br />$1.47 $2.37 <br />$2.37 $38.54 <br />$38.54 ay <br />Swing . <br />: <br />: $0.30 Three shift per day average : $0.25 <br />oze <br />p <br />Mechani $16.74 $4.20 $1.28 $1.04 $1.67 $24.93 Night : $0.45 <br />HOURLY EQUIPMENT COST SUMMA <br />Y Ownership Operating and Overhaul <br />Machine Attachments Operator Total <br />Cost/hr ($) <br />Single shifts : $43.55 $64.95 $0.00 $38.54 $147.04 <br />Double shifts : $28.07 $64.95 $0.00 $38.69 $131.71 <br />Triple shifts : $22.92 $64.95 $0.00 $38.79 R <br />_ $126.65 <br />EQUIPMENT PERFORMANCE DATA Horsepower <br />Description (FHP) <br />Dozer : Cat D7R DS Series 11- 7S 240 <br />Blade : Semi-Universal NA <br />Attachment no. 1 : ROPS Cab NA <br />Attachment no. 2 : NA NA <br />Transmission <br />Type Weight <br />(UST) Length <br />(ft) Width <br />(ft) Height <br />(ft) Fuel <br />type Ripper <br />type <br />NA 27.3 19.8 8.3 11.6 diesel NA <br />NA 4.0 NA 12.1 5.0 NA NA <br />NA NA NA NA NA NA NA <br />NA NA NA NA NA NA NA <br />Total weight : 31.3 (UST)