Laserfiche WebLink
RnnnnRI F FOUIPMENT <br />EQUIPMENT HAUL DISTANCE and TIME <br />sheet 2 of 2 <br /> Nearest major city or town within project area region : A/amosa <br />Transportation Cycle Time : Non- Total one-way travel distance : 55.0 miles <br /> Roadable Roadable Average travel speed : 40.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 1.38 1.38 Total non-roadable mob/demob cost" : $3,239.65 <br />Return time (hours) = 1.38 1.38 ' two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost ** : $0.00 <br />Unloading time (hours) = 0.50 NA ?• one round trip, no haul rig <br />Subtotals = 3.75 2.75 <br />JOB TIME AND COST Total job time : 7.50 hours <br /> Total job cost : $3,240