Laserfiche WebLink
Stark, Jim <br />From: Stark, Jim <br />Sent: 11 March, 2011 09:53 <br />To: Boulay, Mike <br />Cc: Brown, Sandy <br />Subject: Oxbow MR-95 RCE <br />Attachments: Oxbow MR-95 RCE.pdf <br />Mike, <br />Attached is the reclamation cost estimate for the Elk Creek Mine's MR-95 -16 angle drilled gob vent boreholes. The <br />estimate is two tasks (a summary sheet and task 291) and represents an increase in liability of $27,286.00. There are no <br />costs associated with reclaiming drill pads or light-use roads since these GVB's will be drilled on existing drill pads. I have <br />placed a copy of this estimate in for scanning and will have the original sent to you. Please let me know if you have any <br />questions or need any additional information. <br />James R. Stark <br />Environmental Protection Specialist <br />Colorado Department of Natural Resources <br />Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />303-866-3567 X8145 <br />www.mining.state.co.us