storage facilities and were not specifically designed or constructed as impoundments, the applicable requirements <br />of Rule 4.05.9 are addressed in this context by the following descriptions and the referenced existing configuration <br />drawings: <br />Area 1 Pit Temporary Water Storage Basin (TR05 -47) — The Area 1 Pit is a remnant surface mine pit adjacent to <br />the Run -of -Mine Coal Stockpile), as shown on Map 24, Surface Facilities, and by Figure EX8v -1 in Exhibit 8V. <br />Impoundment design, operation, maintenance, and reclamation information is provided in Exhibit 8v. The remnant <br />pit area is a totally incised excavation, enclosed by undisturbed natural ground and backfilled surface mine spoils, <br />with an estimated maximum water storage capacity of approximately 200 acre -feet. The pit area is used for <br />temporary storage of excess mine water, as part of the closed -loop mine dewatering and recycle system. Water <br />inputs to the pit are limited to spoil spring discharge from the adjacent reclaimed spoils areas, excess dewatering <br />flows from the mine dewatering systems, and minor incident precipitation. An upgradient diversion ditch (Ditch D- <br />3) intercepts any surface runoff from upgradient reclaimed surface mine areas and routes it around the Area 1 Pit to <br />Pond D. While a small culvert outlet at the low point on the crest of the pit allows for minor discharge flow to <br />Pond D if the water reaches this level, the temporary storage basin is normally managed to keep water levels well <br />below the discharge pipe. A fixed pumping station is used to control water level, with discharge to a de- sander, <br />located at an old well site, and then to Washplant I or the mine water recycling system, or directly to Pond D for <br />discharge to Foidel Creek. Management of the Area 1 Pit storage basin involves regular inspection and <br />maintenance of water levels and pumping systems, and reduction of water levels prior to spring discharge to <br />provide additional water storage capacity for any minor increases in subsequent spoil spring discharge. <br />With implementation of operations for Washplant II, the Area 1 Pit is also utilized as the primary source for plant <br />make -up water. An additional pump will be placed in the Area 1 Pit and connected to the new 8 -inch water -line. <br />Either a float or submersible pump will be utilized, with pump control and access from the existing pump- station access <br />in the Area 1 Pit. A manhole with manual valves or automated control valves will be used to control flow to the <br />Washplant. In order to address increased mine dewatering requirements, transfer pipelines from the Fish Creek and <br />l ORT dewatering boreholes have been established, with discharge directly to the Area 1 Pit. <br />Washplant I Thickener Overflow Sump (TR05 -47, Superseded by TR07 -59, Washplant II) — The Washplant 1 <br />Thickener Overflow Sump, located adjacent to the Thickener Tank in the Washplant I area, as shown on Map 24, <br />Surface Facilities, and by Figure EX8w -1 in Exhibit 8w was excavated during Washplant construction to serve as a <br />catch basin for the contents of the Thickener, if required for maintenance or under upset conditions. Impoundment <br />design, operation, maintenance, and reclamation information is provided in Exhibit 8w. While it has not been <br />necessary to utilize the basin for this purpose, it is occasionally used to collect and retain minor quantities of <br />Washplant wash -down water. As an incised and closed basin (ie: no outlet) the only inputs are thickener overflow, <br />wash -down water from the Washplant, or minor incident precipitation, which are subsequently pumped back into <br />the system by a portable floating pump installation. Water level in the sump is monitored and managed as part of <br />the ongoing plant operations. <br />Washplant II Thickener Overflow Sump (TR07 -59, Washplant II) — For discussion of Washplant II Thickener <br />Overflow Sump please refer to previous discussion under Rule 2.05.3(3), Mine Facilities. <br />FCB Treatment Facility (Revised - MR07 -216) <br />Three treatment cells were constructed for treating mine discharge water from the Fish Creek Borehole. The cells <br />location and cross - sections are shown on Maps 26 and 32, Fish Creek Borehole Area Facilities, and Access Road, <br />and Fish Creek Settling Pond Plan View and Cross Sections. The design for the culverts for the Fish Creek <br />Borehole Access Road is presented in Exhibit 8R. <br />The facility originally consisted of two adjacent dewatering wells. A water treatment system consisting of three <br />treatment cells, chemical feed stations (sodium hydroxide and sulfuric acid), a substation, access road and <br />powerlines, was subsequently added. The facility was modified in 2006, to replace the sodium hydroxide treatment <br />system with an electro - coagulation unit. In 2007, the inactive Fish Creek Ventilation Shaft was converted to a <br />dewatering installation to replace the inoperable Fish Creek South Dewatering Borehole. The water supply pumps <br />are set within the dewatering wells immediately above the top of the coal seam in sealed mine workings in the <br />Western Mining District. Electricity is supplied by the powerlines shown on Map 39, Powerline Location. Each <br />TR09 -66 2.05 -79 04/11/09 <br />