Laserfiche WebLink
TR -121 Project Plan <br />Projected Commencement date of 8/23/2010 <br />road construction: <br />Projected Commencement date of 8/31/2010 <br />drilling: <br />Right -of -entry documentation: <br />Federal Coal lease COC- 67232; e-mail from Ryan Taylor of USFS dated April 22, 2010; <br />and letter from Levi Broyles of USFS dated August 06, 2010. <br />The following topics for the above - referenced revision are as described in Tab PR -14 of Exhibit 80 of DRMS Mining <br />and Reclamation Permit C -80 -007. <br />Water Resources <br />Vegetation <br />Soils <br />Land Use <br />Proposed Low - Volume Roads (with the exception of the number of road miles that are noted in the attached table, <br />titled Project Details) <br />Drilling Activities <br />De -Gas Installation <br />Monitoring <br />Proposed Drill Hole Plugging Methods <br />Reclamation Plan <br />Anticipated Schedule (with the exception of the commencent dates of road construction and drilling noted above) <br />Reclamation Plan <br />U.S.F.S. Road Use Permit <br />Figures 1, 2, 3, and Typical Cross Section (of road) <br />SedCad Calculations for 0.25 Acre to 2.0 Acre MDW Pads <br />Gas Well Pad Slope Stability Analysis <br />7* -1ZI- 81611-0 <br />