My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-06_PERMIT FILE - C1980007A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2010-08-06_PERMIT FILE - C1980007A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:17:36 PM
Creation date
3/11/2011 8:01:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
8/6/2010
Doc Name
Permit Area
Section_Exhibit Name
2.05.3 Operation Plan - Permit Area
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
West Elk Mine <br />Office and Bathhouse <br />MCC completed an office and bathhouse building in September 1992 (Map 53). This building <br />is approximately 20,000 square feet and consists of two floors. The bathhouse facilities and <br />operations offices occupy the lower floor. The engineering and administration offices occupy <br />the upper floor. An as -built construction description is provided in Exhibit 68. <br />Warehouse <br />MCC expanded the warehouse facilities by converting the former maintenance shop to warehouse <br />area, adding a third level mezzanine inside the existing building and constructing an office <br />addition. The building is approximately 6,000 square feet on the ground level. Warehouse <br />offices, purchasing offices, and material storage occupy the first floor. Additional material <br />storage and offices are located on the second and third level mezzanines. An as -built construction <br />description is provided in Exhibit 68. <br />Maintenance Shop <br />Construction of a maintenance shop was completed in June 1993. The 15,000 square foot shop <br />consists of two levels. The ground floor includes six service bays, including a welding bay and a <br />wash bay. The second level me zzanin e, located in the back half of the building includes offices, a <br />library, a lunch -room, and a locker room. An as -built construction description is provided in <br />Exhibit 68. <br />� Three -Sided Warehouse and Tire Storage Racks <br />In addition to the main warehouse, material storage is provided in the three -sided warehouse. <br />This 4,400 square foot, open -front building contains five bays for materials storage. In addition, <br />MCC constructed tire storage racks to the west of the warehouse building, adjacent to an existing <br />bin wall. The racks are constructed of wood cribbing that will be open on all sides and covered <br />by light gage roofing. As -built descriptions of these structures are provided in Exhibit 68. <br />Surface Shop Building <br />The surface shop building is used for maintenance of surface equipment. The 4,130 square foot <br />building consists of two service bays, a line -up area and a covered area used for sand and gravel <br />storage. A dozer service facility is located adjacent to the surface shop building. It is utilized to <br />perform maintenance on the large surface equipment. As -built descriptions of the surface shop <br />facilities are provided in Exhibit 68. <br />Materials Storage Bench Building <br />Construction of the Materials Storage Bench Buildin g was completed in March 1996. The <br />P <br />building is utilized to store materials that will be used in the mine. The 3,900 square foot <br />building has six bays. The as -built description is provided in Exhibit 68. <br />2.05 -18 Rev. 06105, 01106, 03106, 04106 & 05106- PRIO; 01109- MR350: 04109 - 77?116: 04109- MR353; 05109 - AfR354; 08109- TRI18: <br />08109- TRI19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.