My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-01_REVISION - M1977493 (6)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2011-03-01_REVISION - M1977493 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:47:16 PM
Creation date
3/11/2011 7:44:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
3/1/2011
Doc Name
Response to DRMS Preliminary Review
From
Climax Molybdenum
To
DRMS
Type & Sequence
AM6
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit Amend. Climax Mine • <br />CLIMAX MINE RECLAMATION COST ESTIMATE <br />Financial Reporting Unit Rates <br />Robinson Lake <br />Assumptions: <br />(1) Clean closure including removal of all known sources of contamination will be achieved, thereby rendering the water stored in the lake to be highly useable <br />(2) Per Habitat, Exhibit E, AM06 application, Robinson Lake reclamation will involve (a) excavation of remaining sludge, and (b) biosolids application around the edge. <br />(3) Revegetation is covered elsewhere. <br />Tasks: <br />Pre-Excavation Work and Water Management <br />Sediment and Subsoil Removal <br />Finish Work <br />Timing <br />Slimes only - 22% Lawrence 2008, 38% Skanska 2010, 10% Habitat 2010.11, balance 2011+ <br />Total Cost <br />$2,637,570 <br />Calculations <br />• <br /> <br />7asWArea # of Swell Hre CosttUnit <br />Initial Volume Qty Units Production Units Total Equip Cost/Unit Cost/Unit Total Material <br />Total Labor Cost Total Cost'. <br /> Equip Factor Rag'd Equip Cost Labor Materials Cost <br />Pre-Excavation Work and Water Management $723,070.00 <br />Sadl ment and Scbsoil Removal <br />07,000.00 <br />$ <br />Finch Work $1 <br />$107,500.00 <br /> His Req'd Total Equip Cost Total Labor Cost TotalMatenal Cos' Total Cost <br />TOTAL COSTS . $ 2,637;570 <br />Lower Robinson Lake Cleanout actual costs from 2010 (Skanska) <br />Do not use numbers for Habitat since their numbers are skewed <br />resulting from their slimes failure and higher than typical costs (vs. Lawrence Constr. Co. in 2008 and Skanska in 2010) <br />Description of Work Most Likely Cost in 12131/10 $ <br />General <br />Mobilization $269,000 <br />Environmental - SPCC, Stormwater, 8 Dust Control $20,000 <br />Clearing and Grubbing $10,000 <br />Haul Roads $30,000 <br />Demobilization $15,000 <br />Subtotal $344,000 <br />Pre-Excavation Work and Water Management <br />Diversion, Dewatering and Un-watering $379,070 <br />Subtotal $379,070 <br />Sediment and Subsoil Removal <br />Develop Access into Robinson Lake $15,000 <br />Develop Access into Fill Area $10,000 <br />Excavate and Haul Sediments to Fill Area (300K cy) $5.40 $1,620,000 <br />Excavate, Haul and Place Native Materials (10% over-exc.) $162,000 <br />Subtotal $1,807,000 <br />Finish Work <br />Final Recontounng at Robinson Lake $45,000 <br />Final Recontouring at Fill Area $22,500 <br />Regmde and Re-establish Cover on Face of 2-Dam to Pre-existing Condition $40,000 <br />Subtotal $107,500 <br />Total $2,637,570 <br />Notes: <br />Lawrence Constr. Co. - 4 months in 2008 <br />Skanska - 3 months in 2010 <br />Habitat - 4 months in 2010-2011 <br />Slimes excavated = 220,000 cy <br />Slimes excavated = 380,000 cy <br />Slimes excavated = 100,000 cy max. <br />EA,iGt L <br />Feb 2011
The URL can be used to link to this page
Your browser does not support the video tag.