Laserfiche WebLink
Permit Amendment (AM-06) - Climax Mme <br /> CLIMAX MINE RECLAMATION COST ESTIMATE <br /> Financial Reporting Unit Rates <br /> East Side Channel Construction <br /> Across Tenmile and Mayflower TSFs <br />Assumptions: <br />(1) Construction of the East Side Channel will be done in a manner similar to the completed portions that were done on Robinson TSF in 2005. <br />(2) Knowing the costs for Robinson's East Side Channel, it can be assumed these numbers are applicable to Tenmile and Mayflower. <br />(3) Preliminary sizing provided by Wheeler Feb-2010; spillways for Tenmile and Mayflower will be equivalent to Robinson's 2005 ESC. <br />Tasks: <br />(1) Construct Channel Extensions through Camp, Robinson, Tenmile, and Mayflower. <br />(2) Construct Pipeline Extensions through Camp, Robinson, Tenmile, and Mayflower. <br />Timing <br />End of Mine Life <br />Total Cost <br />$11,967,396 <br />Calculations <br /> <br />Task/Area <br />Qty Units t:; Unit cost/unit <br />Total Equip Cost <br />Total Labor Cost Gost/Unit Total Material Cost Total Cost <br /> Equip Labor Materials <br />East Side Channel <br />Construct Channel Extensions 29,300 ft $63.45 $1,394,218 $464,739 $1,858,958 <br />Geotextiles (furnish & install) 153,889 sq yd $2.08 $159,989 $159,989 $319,979 <br />Rip Rap Armoring along Channel Route 82,737 cy $30.75 $2,544,082 $2,544,082 <br />East Side Pipeline <br />HDPE 42-48" pipe and bedding (furnish & install) 40,900 ft $177.12 $1,811,094 $1,811,094 $3,622,189 $7,244,378 <br /> - Total Equip Cost Total Labor Cost Total Material Cost Total Cost <br />TOTAL COSTS $3,205,313 $2,435,823 $6,326,261 $11,967,396 <br />Climax Mine Permit Amendment AM-06 By Wheeler. 2/24/10 <br />Reclamation Construction Quantities <br />East Side Channel Camp <br />t <br />i <br />E Robinson <br />E <br />t <br />i Tenmile Extension Mayflower <br />EMension Total Units <br />x <br />ens <br />on <br />x <br />ens <br />on <br /> Channel Length: 4,500 5,200 11,000 8,600 29,300 ft <br /> Bottom Width: 6.0 6.0 10.0 16.0 ft <br /> Channel Depth: 6.0 6.0 6.0 6.0 it <br /> Side Slope: 2.0 2.0 2.0 2.0 (H):I(V) <br /> Cross-Section Area: 108.00 108.00 132.00 168.00 sq It <br /> Wetted Perimeter: 32.83 32.83 36.83 42.83 ft <br /> Top Width: 30.00 30.00 34.00 40.00 ft <br /> Channel Volume: 18,000 20,800 53,778 53,511 146,089 cu yds <br /> Channel Excavation: <br />Riprap Si- 18,000 20.800 <br />6.0 6.0 53,778 <br />12.0 53,511 <br />18.0 146,089 cu yds <br />in <br /> Riprap Thickness: 1.00 1.00 2.00 3.00 ft <br /> Riprap Volume: 5,472 6,323 30,012 40,929 82,737 cu yds <br /> Geotextile Length: 42.83 42.83 46.83 52.83 ft <br /> Geotextile Area: 21,416 24,748 57,240 50,485 153,889 sq yds <br /> Road Width: 20.0 20.0 20.0 20.0 ft <br /> Road Surface Area: 90,000 104,000 220,000 172,000 586,000 sq ft <br /> Surfacing Depth: 9.0 9.0 9.0 9.0 in <br /> Surfacing Volume: 2,500 2,889 6,111 4,778 16,278 cu yds <br /> Camp Extenstion = Camp (near TDH) to Hwy 91 crossing <br /> Robinson Extension = Hwy 91 crossing to Robins on spillway structure <br /> Tenmile Extensi on = outall 63" HDPE at 2 Dam to Clinton Gulch <br /> Mayflower Extention = Clinton Gulch to Mayflower Creek <br />East Side Pipeline <br /> Pipe Length: 4,900 8,100 7,900 20,000 40,900 It <br /> Pipe Size: 42 42 42 48 in <br /> Material: ID PE SDR 1HOPE SDR 17 HDPE SDR 17 HD PE SDR 17 PE4710 <br /> Pipe W6ght: 135.372 135.372 135.372 176.812 Ibs/ft <br /> Pipe Weight: 663,323 1,096,513 1,069,439 3,536,210 6,365,515 lbs <br /> Pipe OD Arcs: 9.62 9.62 9.62 12.57 sq ft <br /> Trench Side Space: 1.50 1.50 1.50 1.50 ft <br /> Bedding Base: 0.50 0.50 0.50 0.50 ft <br /> Bedding Cover: 0.50 0.50 0.50 0.50 ft <br /> Soil Cover: 2.00 2.00 2.00 2.00 ft <br /> Trench Width: 6.50 6.50 6.50 7.00 ft <br /> Trench Depth: 6.50 6.50 6.50 7.00 ft <br /> Trench Area: 42.25 42.25 42.25 49.00 sq ft <br /> Trench Volume: 7,668 12,675 12,362 36,296 69,001 cu yds <br /> Bedding Area: 19.63 19.63 19.63 22.43 sq ft <br /> Bedding Volume: 3,562 5,889 5,743 16,618 31,812 cu yds <br /> <br />[5nibil L <br />Feb 2011