Laserfiche WebLink
Permit Amendi'96) - Climax Mine 0 • <br />CLIMAX MINE RECLAMATION COST ESTIMATE <br />Financial Reporting Unit Rates <br />Open Pit <br />Assumptions <br />(1) Signs will be placed on 300 foot centers. <br />(2) Moving suitable in-pit materials for tailing reclamation is included on the TSF calculation sheets. <br />Tasks <br />(1) Grade west open pit periphery. From previous state based estimate <br />(2) Haul and spread topsoil at west open pit perimeter. From previous state based estimate <br />(3) Install NO-Trespassing signs where needed. <br />Timing <br />End of Mine Life <br />Total Cost <br />$28,331 <br />Calculations <br />Task/Area #of Initial Swell <br />Equip Volume Factor <br />Units <br />City <br />Production <br />Units Hrs Req'd CostNnit <br /> <br />E Total Equip Cost/Unit <br />Total Labor Cost Cost/Unit <br />Total Material Cost <br />Total Cost <br /> quip Cost Labor Materials <br />(1) Grade west open pit periphery. <br />CAT D9N Dozer 1 32,267 1.33 42,915 (cy) 158.40 (cy/hr) 270.93 $228.01 $61,774.04 $33.81 $9,158.85 $70 <br />933 <br />(2) Haul and spread topsoil at west open pit perimeter. , <br />CAT 773B Haul Truck 3 26,900 1.215 32,684 (cy) 231.28 (cy/hr) 141 $215.83 $30,500.19 $30.02 $4,242.20 $34 <br />742 <br />w/ CAT 988B Loader 1 Trucks Per Loader 3 47 $231.12 $10,887.18 $30.40 $1,432.22 , <br />$12 <br />319 <br />D6H 1 47 $103.24 $4,86119 $33.81 $1,592.40 , <br />$6 <br />456 <br />12G 1 47 $62.83 $2,959.72 $32.37 $1,524.95 , <br />$4 <br />485 <br />Water Truck 1 47 $69.43 $3,270.28 $30.02 $1,414.07 , <br />$4 <br />684 <br />(3) Place Signs - 500 ft centers around pit perimeter 23 signs $ 16.50 $ 387 , <br />$387 <br /> Hire Req'd Total Equip Cost Total Labor Cost Total Material Cost Total Cost <br />TOTAL COSTS <br />600.67 <br />$21,960.37 <br />$5,963.63 <br />$387 <br />$28,331 <br />Exhibit L <br />Feb 2011