Laserfiche WebLink
Table 1 <br />EVAPORATIVE LOSSES & REPLACEMENT SCHEDULE <br />Baxter Road Pit <br />2011 Plan Year <br />(1) (21 (3) Id) 1S) rF) i? 'DI <br /> <br /> <br />Month <br />Percent of <br />Annual <br />Evaporation <br />Gross Pond <br />'Evaporation <br /> <br />(inches) <br />Average <br />Precipitation <br /> <br />(inches) <br />Effective <br />Precipitation <br />70% <br />(inches) <br />Net Pond <br />Evaporation <br /> <br />(inches) Total <br />Evaporative. <br />Loss <br />4 acres <br />(acre-feet) <br />Lagged <br />Depletions <br /> <br />(acre-feet) LAVWCD <br />Replacement <br />Water <br />Provided <br />(acre-feet) <br />Apr-11 9.0%n 4.59 0.88 0.62 3.97 1.32 1.14 1.14 <br />May-11 12.0% 6.12 1.25 0.88 5.25 1.75 1.52 1.52 <br />Jun-11 14.5% 7.40 1.25 0.88 6.52 2.17 1.90 1.90 <br />Ju141 15.0% 7.65 2.09 1.46 6.19 2.06 1.93 1.93 <br />Aug-11 13.5% 6.89 1.99 1.39 5.49 1.83 1.78 1.78 <br />Sep-11 10.0% 5.10 0.91 0.64 4.46 1.49 1.53 1.53 <br />Octn 7.0% 3.57 0.57 0.40 3.17 1.06 1.19 1.19 <br />Nov-11 4.0%n 2.04 0.43 0.30 1.74 0.58 0.78 0.78 <br />Pec-11 3.0% 1.53 0.35 0.25 1.29 0.43 0.58 0.58 <br />Tan-12 3.0% 1.53 0.32 0.22 1.31 0.44 0.53 0.53 <br />Febi 42 3.5% 1.79 0.31 0.22 1.57 0.52 0.57 0.57 <br />Mar.-12 5.5% 2.81 0.78 0.55 2.26 0.75 0.72 0.72 <br />Totals 100% 51.00 11.13 7.79 43.21 14.40 14.16 14.16 <br />Notes: <br />(1) Equals the Monthly Distribution from SB 120. <br />(2) Based on NOAA mapping distributed based on Column (1). <br />(3) Based on climate data from Pueblo WSO AP weather station. <br />(4) Equals column (3) times 70 percent. <br />(5) Equals column (2) minus (4), adjusted for negative months. <br />(6) Equals column (5) times acreage divided by 12. <br />(7) Lagged stream depletions calculated using the State's stream depletion model (Table 2). <br />(8) Replacement water provided by 5-year contract with the Lower Arkansas Valley Water Conservancy District for 21 ac-ft of Larkspur Ditch. <br />Deere 8 Ault Consultants, Inc. 11/19/2010 2011 Baxter Pit Tables.xis