Laserfiche WebLink
Mr. Dick Wolfe, P.E. <br />December 31, 2010 <br />Page 4 <br />CONCLUSION <br />This plan provides an evaluation of the stream depletions expected as a result of evaporation at <br />RBK Construction's Baxter Road Pit east of Pueblo, Colorado and presents a means by which <br />those stream depletions will be replaced in order to prevent injury to other water rights on the <br />Arkansas River. <br />If you require copies of documentation provided with previous renewal requests, please let us <br />know and we will forward them to you. Please feel free to call if you have any questions during <br />your review (Mark McLean at 303-651-1468). <br />Sincerely, <br />Deere & Ault Consultants, Inc. <br />Mark A. McLean, P.E. <br />Principal <br />Attachments <br />cc: Joe Baxter, RBK Construction, Inc. (w/ attachments) <br />Scott Lorenz, AGUA (w/ attachments) <br />Steve Witte, Division 2 Engineer (w/ attachments) <br />Jay Winner, LAVWCD (w/ attachments) <br />P:\0189 RBK Construction\007 2011 Baxter Road Pit SWSP\2011 Renewal Banter Pit. doe