My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-02-28_REVISION - M1981185 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2011-02-28_REVISION - M1981185 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:08 PM
Creation date
3/10/2011 8:39:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
2/28/2011
Doc Name
Applicant response to objection (CN-01)
From
R2Incorporated
To
DRMS
Type & Sequence
CN1
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.3 Cure by Lessee. If the Lessee elects to cure defects not corrected by the Lessor, it may <br />recover its curative costs from fifty percent (50 %) of the value of any royalty payments <br />thereafter accruing, to a maximum of $1,000. Curative costs to the Lessee in excess of <br />$1,000 shall be its sole <br />responsi bili ty. <br />3.4 Title Failure After Examination Period. In the event of a title failure at any time after the <br />examination period and during the term hereof, the Lessor shall not be liable therefore in <br />damages or otherwise, and such title failure shall not operate to reduce any payment due to <br />the Lessor pursuant to this Mining Lease, except to the extent such title failure is a result of <br />encumbrances or other defects in title created by, through or under the Lessor and except that <br />royalties on production payable to the Lessor shall be paid only in proportion which the <br />Lessor's interest in the part of the Mining Properties from which the royalties on production <br />occur bears to the entire mineral interest therein. <br />4.1 Performance of Work. The parties have agreed that no minimum amount of work will be <br />required during the first five years of the lease term. Thereafter, the Lessee agrees to expend <br />not less than the amounts set forth during each lease year on the following schedule: <br />The second year of the Mining Lease The third year of the Mining. Lease and each lease year <br />thereafter <br />$ 15,000 $ 20,000 $ 30,000; <br />Such expenditures are to be for exploration, development, mining or related operations in or <br />for the benefit of the Mining Properties. Amounts expended shall include, but not by way of <br />limitation, expenditures for test and development drilling and excavations, both surface and <br />underground; rental of equipment used in operations in the leased premises or if equipment <br />used in the operations is owned by Lessee, equivalent rental computed at the current rental <br />schedule of the Associated Equipment Distributors for equipment used in Colorado; <br />expenditures for servicing and maintaining the rented or owned equipment; expenditures for <br />geological mapping, surveying, sampling and assaying and metallurgical test work, <br />engineering
The URL can be used to link to this page
Your browser does not support the video tag.