My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-09_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2011-03-09_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:31:36 PM
Creation date
3/10/2011 7:57:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
REVISION
Doc Date
3/9/2011
Doc Name
Cost Summary Work
From
Jim Stark
To
File
Type & Sequence
MR145
Email Name
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task # 202 Page 2 of 2 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 (AVG.) <br />0.830 (1 SHIFT/DAY) <br />1.000 (DOZ-OC) <br />1.000 (CAT HB) <br />1.000 (CAT HB) <br />0.868 (CAT HB) <br />1.000 (PAT) <br />Net correction: 0.4863 <br />Adjusted unit production: 494.62 LCY/hr <br />Adjusted fleet production: 494.62 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.321/LCY <br /> <br />Total job time: 16.43 Hours <br />Total job cost: $2,606.77 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.