Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 202 Page 2 of 2 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 (AVG.) <br />0.830 (1 SHIFT/DAY) <br />1.000 (DOZ-OC) <br />1.000 (CAT HB) <br />1.000 (CAT HB) <br />0.868 (CAT HB) <br />1.000 (PAT) <br />Net correction: 0.4863 <br />Adjusted unit production: 494.62 LCY/hr <br />Adjusted fleet production: 494.62 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.321/LCY <br /> <br />Total job time: 16.43 Hours <br />Total job cost: $2,606.77 <br />CIRCES Cost Estimating Software <br />