Laserfiche WebLink
46cip Task description: <br />Site: Deserado Mine <br />PROJECT IDENTIFICATION <br />Task #: 200 State: Colorado <br />Date: 09-Mar-11 County: Rio Blanco <br />User: JRS <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Task <br />Descri tion Form <br />Used Fleet <br />Size Task <br />Hours <br />Cost <br />201 Plug and Seal Degas and Nitrogen Injection Holes BOREHOLE 1 18.00 $2,463.03 <br />202 Regrade Nine Drill Pads DOZER 1 16.43 $2,606.77 <br />203 Regrade Light-Use Roads DOZER 1 3.01 $478.42 <br />204 Replace Topsoil to Nine Drill Pads DOZER 1 7.11 $1,128.84 <br />206 Reseed Nine Drill Pads REVEGE 1 5.40 $1,959.31 <br />207 Reseed Light-Use Roads REVEGE 1 3.64 $1,337.40 <br />SUBTOTALS: 53.59 $ $9,973.77 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $201.47 <br />Performance bond: 1.05 Total = $104.72 <br />Job superintendent: 34.33 Total = $2,010.36 <br />Profit: 10.00 Total = $997.38 <br /> TOTAL O & P = $3,313.93 <br />CONT RACT AMOUNT (direct + O & P) = $13,287.70 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 0.00 Total = 0.00 <br />Engineering work and/or contract/bid preparation: 4.25 Total = $564.73 <br />Reclamation management and/or administration: 3.25 $431.85 <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $4,310.51 <br />TOTAL BOND AMOUNT (direct + indirect) = $14,284.28 <br />COST SUMMARY WORK <br />Minor Revision 145 Summary Sheet <br />Permit Action: Minor Revision 145 Permit/Job#: C1981018 <br />Abbreviation: None <br />Filename: CO 18-200 <br />