Laserfiche WebLink
ADJUSTED COSTS Ownership Costs <br /> <br />Depreciation CFC Overhead Overhaul and Operating Costs sheet 2 of 2 <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Acquisition cost : $10.55 NA NA NA NA NA NA NA NA NA NA <br />Econ. life -Drill and suppt. unit no. 1 : $10.55 NA NA $1.29 $2.03 $3.55 $4.39 NA NA NA NA <br />- Support unit no. 2 : $0.00 NA NA $0.00 $0.00 $0.00 $0.00 NA NA NA NA <br />Annual usage : $20.25 $3.61 $3.65 NA NA NA NA NA NA NA NA <br />Double shifts : $15.19 $1.80 $1.82 NA NA NA NA NA NA NA NA <br />Triple shifts : $13.51 $1.20 $1.21 NA NA NA NA NA NA NA NA <br />Mech. labor -Drill and suppt. no. 1 : NA NA NA $0.77 NA $2.11 NA NA NA NA NA <br />- Support unit no. 2 : NA NA NA $0.00 NA $0.00 NA NA NA NA NA <br />Fuel/lube -Drill and suppt. unit no. 1 : NA NA NA NA NA NA NA $12.82 $2.00 $0.21 $0.00 <br />- Support unit no. 2 : NA NA NA NA NA NA NA $0.00 $0.00 $0.00 $0.00 <br />---- <br />ADJUSTED COST SUBTOTALS -- <br /> <br /> <br />epreciation <br />Ownership Costs <br /> <br />CFC <br /> <br /> <br />verhead <br /> <br />Overhaul <br />Labor Parts ----- <br />Overhaul and Operating Costs <br />Field Repair <br />Labor Parts Fuel Lube Tires G.E.C. <br />Drill, Support Unit No. 1 and Support Unit No. 2 : Drill and Support Unit No. 1 <br />Single shifts : $20.25 $3.61 $3.65 $0.77 $2.03 $2.11 $4.39 $12.82 $2.00 $0.21 $0.00 <br />Double shifts : $15.19 $1.80 $1.82 Support Unit No. 2 : <br />Triple shifts : $13.51 $1.20 $1.21 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />HOURLY OPERATOR WAGES Base Fringe F.I.C.A. Unempl. Wk.Comp. Total <br /> Rate Benefits 7.65% 6.20% 12.60% ($/hr) Shift Differential Colorado labor zone : 2 <br />Driller - Diamond or Core Drill $16.74 $4.41 $1.28 $1.04 $2.11 $25.58 Day: $0.00 Two shift per day average : $0.15 <br />Laborer - Diamond or Core Drill $12.44 $3.53 $0.95 $0.77 $1.57 $19.26 Shift : $0.30 three shift per day average : $0.25 <br />Mechanic $16.74 $4.20 $1.28 $1.04 $2.11 $25.37 Night : $0.45 <br />HOURLY EQUIPMENT COST SUMMARY Ownership Operating and Overhaul <br />Drill and/or Suppt. no.1 Suppt. no.2 Operator(s) Total <br />Costlhr ($) <br />Single shifts : $27.51 $24.33 $0.00 $44.84 $96.67 <br />Double shifts : $18.82 $24.33 $0.00 $45.14 $88.28 <br />Triple shifts : $15.92 $24.33 $0.00 $45.34 $85.59 <br />EQUIPMENT SPECIFICATIONS <br /> Pressure <br />DRILLING EQUIPMENT Operating weight basis Horsepower Fuel <br />DESCRIPTION TYPE SIZE (UST) (@ PSI) (fhp) type <br />GENERIC 3.9 in. - 3,100 ft. capy. Trailer mtd. short coring rig 5.5 in. max. bore 8.00 NA 82.0 diesel <br />NA NA NA NA NA NA NA <br />NA NA NA NA NA NA NA <br />is <br />r <br />i <br />a