My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-09_REVISION - C1981033
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981033
>
2011-03-09_REVISION - C1981033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:31:36 PM
Creation date
3/10/2011 7:57:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
REVISION
Doc Date
3/9/2011
Doc Name
Review Letter & Reclamation Cost Estimate
From
DRMS
To
Bear Coal Company
Type & Sequence
SL4
Email Name
JJD
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
---- - <br />ADJUSTED COSTS <br /> <br /> <br />Acquisition cost : <br />Econ.life -Dozer and ROPS : --- - <br />Ownership Costs <br /> <br />Depreciation CFC Overhead <br />$4.08 NA NA <br />$4.08 NA NA _ T <br />Overhaul and Operating Costs sheet 2 of 2 <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />NA NA NA NA NA NA NA NA <br />$4.49 $2.65 $5.48 $2.34 NA NA NA NA <br />-Attachment no. 2: NA NA NA $0.53 $0.29 $0.88 $0.36 NA NA NA NA <br />Annual usage : $6.71 $3.19 $2.93 NA NA NA NA NA NA NA NA <br />Double shifts : $5.03 $1.59 $1.46 NA NA NA NA NA NA NA NA <br />Triple shifts : $4.47 $1.06 $0.97 NA NA NA NA NA NA NA NA <br />Mechanic labor-Dozer and ROPS : NA NA NA $2.62 NA $3.20 NA NA NA NA NA <br />-Attachment no. 2 : NA NA NA $0.31 NA $0.51 NA NA NA NA NA <br />Fuel/tube -Dozer and ROPS : NA NA NA NA NA NA NA $6.47 $1.25 $0.00 $0.37 <br />Attachment no. 2 : NA NA NA NA NA NA NA $0.00 $0.07 $0.00 $0_30 <br />ADJUSTED COST SUBTOTALS _ <br /> <br />Depreciation Ownership Costs <br /> <br />CFC <br /> <br />Overhead _ <br />Overhaul <br />Labor Parts Overhaul and Operating Costs <br />Field Repair <br />Labor Parts Fuel Lube Tires G.E.C. <br />Dozer, ROPS and Attachment no. 2 : Dozer and ROPS : <br />Single shifts : $6.71 $3.19 $2.93 $2.62 $2.65 $3.20 $2.34 $6.47 $1.25 $0.00 $0.37 <br />Double shifts : $5.03 $1.59 $1.46 ttachment no. 2 : <br />Triple shifts : $4.47 $1.06 $0.97 $0.31 $0.29 $0.51 $0.36 $0.00 $0.07 $0.00 $0.30 <br />HOURLY OPERATOR WAGES Base Fringe F.I.C.A. Unempl. Wk.Comp. Total <br /> Rate Benefits 7.65% 6.20% 10.00% ($/hr) Shift Differential Colorado labor zone : 2 <br />Dozer operator (< 70hp $23.67 $9.22 $1.81 $1.47 $2.37 $38.54 Day : saw Two shift per day average : $0.15 <br />Dozer operator (-70hp $23.67 $9.22 $1.81 $1.47 $2.37 $38.54 Swing : $0.30 Three shift per day average : $0.25 <br />Mechanic $16.74 $4.20 $1.28 $1.04 $1.67 $24.93 Night: $0.45 <br />HOURLY EQUIPMENT COST SUMMARY Ownership Operating and Overhaul <br />Machine Attachments Operator Total <br />Cost/hr ($) <br />Single shifts : $12.82 $18.90 $1.84 $38.54 $72.10 <br />Double shifts : $8.09 $18.90 $1.84 $38.69 $67.52 <br />Triple shifts : $6.51 $18.90 $1.84 $38.79 $66.04 <br />EQUIPMENT PERFORMANCE DATA <br />Description Horsepower <br />(FHP) Transmission <br />Type Weight <br />(UST) . Length <br />(ft) Width <br />(ft) Height <br />(ft) Fuel <br />type Ripper <br />type <br />Dozer : Cat D3G XL - 3P 70 NA 8.1 13.2 6.2 9.0 diesel NA <br />Blade : Power Angle Tilt NA NA 1.1 NA 8.1 3.1 NA NA <br />Attachment no. 1 : ROPS Cab NA NA NA NA NA NA NA NA <br />Attachment no. 2: 13-shank ripper NA NA 0.6 2.6 5.1 1.1 NA Fixed Parallelogram <br />}y <br />71 <br />ra <br />I otai weignt :( a.rs tuo 11.
The URL can be used to link to this page
Your browser does not support the video tag.