Laserfiche WebLink
i41 <br />ROADABLE EQUIPMENT <br />Machine Total Fleet Size <br />Description Cost/hour/unit (No. units) <br />sheet 2 of 2 <br />Haul Trip Return Trip <br />Cost/hr/fleet Cost/hr/fleet <br /> Subtotals : 1 $0.00 $0.00 <br /> <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Grand Junction <br />Transportation Cycle Time : Non- Total one-way travel distance : 120.0 miles <br /> Roadable Roadable Average travel speed : 45.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 2.67 2.67 Total non-roadable mob/demob cost $10,450.10 <br />Return time (hours) = 2.67 2.67 ' two round trips with haul rig <br />Loading time (hours) = 2.00 NA Total roadable mob/demob cost *' : $0.00 <br />Unloading time (hours) = 1.00 NA .* one round trip, no haul rig <br />Subtotals = 8.33 5.33 <br />JOB TIME AND COST <br />Total job time : 16.67 hours <br />Total job cost : $10,450 <br />