Laserfiche WebLink
9%. Travis Marshall <br />Page 2 of 3 <br />2. AMSO will provide financial warranty in the agreed upon amount prior to implementing <br />the actions described in Modification 05. Based on the post-operational monitoring cost <br />estimate presented above, AMSO believes the projected cost of reclamation is as follows: <br />Item No. Direct Cost <br />O 1 a $195,913 <br />02a $55,510 <br />03a $51,121 <br />04a $6,282 <br />05a $8,659 <br />06a $4,992 <br />07a $6,872 <br />08a $349 <br />09a $3,078 <br />l0a $935 <br />Ila $333 <br />12a $471 <br />13a $435 <br />14a $20,490 <br />15a $2,929 <br />16a $60,000 <br />Total Direct Cost: <br />$418,369 <br />Liability Insurance (2.02% of direct): $ 8,451 <br />Performance Bond (1.05% of direct): $ 4,393 <br />Job Superintendent (378.71 hrs x $52.10/hr): $ 19,731 <br />Profit 10% of direct): $ 41,837 <br />Total O & P: $ 74,412 <br />Contract Amount (direct + O & P): $492,781 <br />Financial warranty processing: $ 500 <br />Engineering work and/or contract/bid prep (4.25% of cntr.): $ 20,943 <br />Reclamation mgmt and/or administration (5% of cntr.): $ 24,639 <br />Total Indirect Cost: $120,494 <br />Total Bond Amount (direct + indirect): $538,863 <br />3. AMSO acknowledges that drill pad MWP-1 was inadvertently excluded from the area of <br />disturbance tabulation. The area of disturbance at MWP-1 is 1.2 acres. A revised <br />breakdown of the disturbed acreage under the NOI, with approval of Modification 05, is <br />as follows: