My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-02-18_REVISION - P2008046 (4)
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2008046
>
2011-02-18_REVISION - P2008046 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:32:33 AM
Creation date
3/9/2011 8:22:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008046
IBM Index Class Name
REVISION
Doc Date
2/18/2011
Doc Name
Response to notice of deficiency (MD-05)
From
American Shale Oil LLC
To
DRMS
Type & Sequence
MD5
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9%. Travis Marshall <br />Page 2 of 3 <br />2. AMSO will provide financial warranty in the agreed upon amount prior to implementing <br />the actions described in Modification 05. Based on the post-operational monitoring cost <br />estimate presented above, AMSO believes the projected cost of reclamation is as follows: <br />Item No. Direct Cost <br />O 1 a $195,913 <br />02a $55,510 <br />03a $51,121 <br />04a $6,282 <br />05a $8,659 <br />06a $4,992 <br />07a $6,872 <br />08a $349 <br />09a $3,078 <br />l0a $935 <br />Ila $333 <br />12a $471 <br />13a $435 <br />14a $20,490 <br />15a $2,929 <br />16a $60,000 <br />Total Direct Cost: <br />$418,369 <br />Liability Insurance (2.02% of direct): $ 8,451 <br />Performance Bond (1.05% of direct): $ 4,393 <br />Job Superintendent (378.71 hrs x $52.10/hr): $ 19,731 <br />Profit 10% of direct): $ 41,837 <br />Total O & P: $ 74,412 <br />Contract Amount (direct + O & P): $492,781 <br />Financial warranty processing: $ 500 <br />Engineering work and/or contract/bid prep (4.25% of cntr.): $ 20,943 <br />Reclamation mgmt and/or administration (5% of cntr.): $ 24,639 <br />Total Indirect Cost: $120,494 <br />Total Bond Amount (direct + indirect): $538,863 <br />3. AMSO acknowledges that drill pad MWP-1 was inadvertently excluded from the area of <br />disturbance tabulation. The area of disturbance at MWP-1 is 1.2 acres. A revised <br />breakdown of the disturbed acreage under the NOI, with approval of Modification 05, is <br />as follows:
The URL can be used to link to this page
Your browser does not support the video tag.