Laserfiche WebLink
6 (FORM 2 - Public filing) <br />8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />See attached for complete description. Topsoil is thin granitic soil. Soil is scraped from site <br />and stored next to dig site. It is replaced after disturbance to original depth. <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />No drill holes. <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />Only shallow excavations will be used. Upon completion of each prospect excavation, the <br />hole will be filled using a track hoe or back hoe. After replacing the regolith and overburden <br />rock, the topsoll will be spread on top to its original i <br />promoting rag ss regrowth SitP_ will hP reseeded and monitored for growth- Where slope is <br />greater than 15%, berms will be installed downslope. <br />11. Describe how roads will be reclaimed or returned to their pre-prospecting (or better) condition: <br />NO nel-N roads I-Mill he bUilt- Rre-existing 4VVD trails Will he used for walking On the <br />equipment No other vehicles will be off road. When the machine is walked out, any new <br />disturbance will be recontoured and reseeded.