My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-07_HYDROLOGY - M1977348
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977348
>
2011-03-07_HYDROLOGY - M1977348
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:31:31 PM
Creation date
3/8/2011 11:41:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977348
IBM Index Class Name
HYDROLOGY
Doc Date
3/7/2011
Doc Name
Summary of the March 1, 2011 Conference Call
From
Golder Associates
To
DRMS
Permit Index Doc Type
Hydrology Report
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V <br />Colorado Division of Reclamation Mining and Safety <br />Mr. Eric Scott 2 <br />March 4, 2011 <br />103-81640 <br />¦ Sampling Locations: Since the main concern is groundwater quality down gradient of <br />the site, Holcim and Golder asked DRMS if they thought it was necessary to include <br />upgradient well MW-1 in the additional groundwater sampling program. DRMS stated <br />that they felt it is important to continue sampling well MW-1 on the same schedule as the <br />other wells because any changes in upgradient conditions could provide useful <br />information for evaluating results from the downgradient wells. Holcim and Golder <br />understood from this discussion that the topic of reducing the sampling locations could <br />also be re-evaluated in the future after additional 2011 data has been collected. <br />Please let us know if you have any questions or feel the descriptions presented in this letter do not <br />accurately capture the discussions from the March 1, 2011 conference call. <br />Sincerely, <br />GOLDER ASSOCIATES INC. <br />/s47 <br />ra Harkins <br />Staff Geologist <br />J. 7?t4 <br />Ed Pottorff <br />Senior Hydrogeologist <br />cc: Mike Toelle <br />Meg Garakani <br />Lisa Olsen <br />Attachments: <br />Table 1: Proposed Sampling Schedule <br />Table 2: Analyte list <br />1:110\81640\0100summarymamhl_2011mnfc ll_fnl-04mar11\summarymarl_2011mnfc U fnl-04mar11.do <br />i Offil. Golder <br />Associates
The URL can be used to link to this page
Your browser does not support the video tag.