Laserfiche WebLink
monitoring plan, and Division approval of this plan must be obtained before full-scale mining and <br />processing resumes at the site, and; the Operator shall submit for Division review a revised <br />Environmental Protection Plan (EPP) for the site, and Division approval of this plan must be <br />obtained before full-scale mining and processing resumes at the site. <br />III. DIVISION RECOMMENDATION <br />It is the Division's determination that the Applicant has fulfilled all of the minimum requirements <br />for approval of AM-06 for the Climax Mine site, and recommends that the permit for the site be <br />approved, with the following additional stipulations. <br />STIPULATIONS: <br />1.) The Operator shall submit for Division review a revised comprehensive water monitoring plan, <br />and Division approval of this plan must be obtained before full-scale mining and processing <br />resumes at the site. <br />2.) The Operator shall submit for Division review a revised Environmental Protection Plan (EPP) <br />for the site, and Division approval of this plan must be obtained before full-scale mining and <br />processing resumes at the site. <br />4