My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-03_REVISION - M2007087
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2007087
>
2011-03-03_REVISION - M2007087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:38:15 PM
Creation date
3/8/2011 11:41:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007087
IBM Index Class Name
REVISION
Doc Date
3/3/2011
Doc Name
Bond Reduction Request
From
Albert Frei & Sons
To
DRMS
Type & Sequence
SR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w <br />s <br />RECLAMATION COST REVISION <br />Revised: March 3, 2011 <br />The following information depicts a worse case scenario when <br />it would be most expensive to reclaim the site not that there is <br />on ground water exposed. It will no longer be necessary to <br />import fill to complete reclamation on the site. Only grading <br />and shaping of the area, resoiling and revegetation will be <br />needed. This is an attempt to set the bond so there is flexibil- <br />ity to operate the mine without reevaluating the bond yearly. <br />This reclamation cost estimate in based on the assumption that <br />there will be no more than 13.68 acres ± needing reclamation at <br />any one time. <br />We used as a source the COST SUMMARY FORM prepared by the <br />Division in 2007 and present it using calculation as laid out on <br />that form. <br />Task Description Direct Cost <br />001- Abandon Drill Holes $1,275.00 <br />002- Spread Topsoil $6,792.00 <br />003- Revegetation $11,148.00 <br />004- Mob/demobe $1,000.00 <br />005- Excavate french drain trench $168.00 <br />1006- Backfill trench $10,810.00 <br />Total Direct costs $31,193.00 <br />Liability insurance @ 2.02% $630.00 <br />Performance bond @ 1.05% $328.00 <br />Job Superintendent 121.09 hrs @ $41.25/hr $4,99S.00 <br />Profit @ 10% $3,119.00 <br />Engineering work @ 4.25% $386.00 <br />Reclamation Management @ 5.0% $454.00 <br />-Total--Indirect-costs <br />Total bond $9,912.00 <br />$41,105.00 <br />Based on this summary analysis we request the bond be <br />reduced from $562,754.00 to $41,100.00.
The URL can be used to link to this page
Your browser does not support the video tag.