Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION I DEMOBILIZATION <br />_ sheet 1 of 2 <br />PROJECT IDENTIFICATION <br />Agency or organization name : DRMS - - - <br />Task #: 08a State :Colorado Permit/job # :M-1979-002 <br />Date : 0212812011 County : Delta Abbreviation :none User : THM Site :North Delta Pit Filename : M002-08a _ <br />Permit or other job action :Final Reclamation Cost Estimate <br />Task description : Mob. / Demob. <br /> <br />Shift <br />EQUIPMENT TRANSPORT RIG COST basis : <br />1 per day <br />Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available ig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : hip cost/hour : $16.63 $18.37 $22.33 <br />j <br />ng cost/hour : $44.38 $46.13 $50.07 <br />tor cost/hour : $27.66 $27.66 $27.66 <br />per cost/hour $0.00 $25.39 $25.39 <br />nit Cost/hour : $88.67 $117.55 $125.45 <br />NON-ROADABLt tWUR-MC rv i <br />mit <br />DOT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet <br />01 Return Trip <br />Cost/hr/fleet <br />67 <br />$88 per <br />Cost/fleet <br />00 <br />$250 <br />-CAT 950G (2002) <br />-Cat D7R DS Series 11- 7SU <br />-Revegetation Tractor 19.52 <br />31.25 <br />15.00 $19.34 <br />$43.55 <br />$20.00 $88.67 <br />$117.55 <br />$88.67 1 <br />1 <br />1 $108. <br />$161.10 <br />$108.67 . <br />$117.55 <br />$88.67 . <br />$250.00 <br />$250.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> 89 <br />$294 00 <br />$750 <br /> Subtotals : $377.78. . .