My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-02-28_INSPECTION - M1979002
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1979002
>
2011-02-28_INSPECTION - M1979002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:31:15 PM
Creation date
3/8/2011 9:32:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979002
IBM Index Class Name
INSPECTION
Doc Date
2/28/2011
Doc Name
Inspection report
From
DRMS
To
Lafarge West, Inc.
Inspection Date
2/14/2011
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />WHEEL LOADER - LOAD AND CARRY WORK <br />PROJECT IDENTIFICATION <br />Task #: 06a State : Colorado Permit/job #:M-1979-002 <br />Date : 0212472011 County : Delta Abbreviation :none <br />User : THM Site :North Delta Pit Filename : M002-06a <br /> <br />Agency or organization name : DBMS <br />Permit or other job action :Final Reclamation Cost Estimate <br />Task description : Haul topsoil from stockpile to replacment location <br /> <br />HOURLY EQUIPMENT COST Basic machine: CAT 950G (2002) Horsepower : 180 <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $19.34 NA <br />Operating cost/hour : $33.20 100 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $91.08 Total fleet cost/hour : $91.08 <br />MATERIAL QUANTITIES <br />Initial Swell Final <br />volume : 5,000 LCY factor : NA volume : 5,000 LCY <br />Source of quantity take-off :Assumed portion of facilities area separated from stockpile location <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION (Cat HB) <br />Loader Cycle Time Unadjusted basic cycle time (load, dump, maneuver) : 0.550 minutes <br />Cycle Time Factors Factor (min.) Source <br />Material : Material 374" to 6" diameter 0.000 (Cat HB) <br />Stockpile : Conveyor or dozer piled 10 ft. high or less 0.010 (Cat HB) <br />Truck ownership : Common ownership of trucks and loaders -0.040 (Cat 148) <br />Operation : Constant operation -0.040 (Cat HB) <br />Dump target : No adjustment - factor not applicable 0.000 (Cat HB) <br />Net cycle time adjustment <br />Adjusted basic cycle time <br />_0 0M <br />minutes <br />minutes <br />(/_4111/ <br />Rolling Resistance - Road Conditions <br />Haul :Firm, smooth, rolling, dirt/It. surfaced, watered, maintained <br />Return :Firm, smooth, rolling, dirt7lt. surfaced, watered, maintained <br />Haul and Return Time Length <br />(feet) Grade res. <br />(%) Rolling res. <br />(°70) Total res. <br />(°70) Travel time <br />(minutes) Data <br />Source <br />Haul route : 450 0.00 3.00 <br />- 3.00 0.3758 (Cat HB) <br />Return route : 450 0.00--- 3.00 <br />F 3.00 0.3514 (Cat HB) <br /> Total travel time : 0.7271 minutes <br />Loader Bucket Capacity Total cycle time : 1.207 minutes <br />Rated capacity : 3.75 LCY (heaped) (Cat HB) <br />Bucket fill factor : 0.925 Loose material - 178" to 378" (90 - 95%) <br />Adjusted capacity : 3.47 LCY <br /> Source <br />Job Condition Correction Factors Altitude adjustment factor : 1.00 (Cat HB) <br />Site altitude : 4,940 feet Job efficiency factor : 0.83 (1 shift7day) <br /> Net correction : 0.83 multiplier <br />Unadjusted hourly unit production : 172.42 LCYIHr <br />Adjusted hourly unit production : 143.11 LCY/Hr (Cat HB) <br />Adjusted hourly fleet production : 143.11 LCY/Hr <br />JOB TIME AND COST <br />Fleet size : 1 Loader(s) Total job time : 34.94 Hours <br />Unit cost : $0.636 /LCY Total job cost : $3,182
The URL can be used to link to this page
Your browser does not support the video tag.