Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 04a State : Colorado Permit/job# : M-1979-002 <br />Date : 0212412011 County :Delta Abbreviation :none <br />User: THM Site :North Delta Pit Filename :M002-04a <br />Agency or organization name: DRMS <br />Permit or other job action :Final Reclamation Cost Estimate _ <br />Task description : Distribute topsoil on pond shore <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D7R DS Series 11 - 7SU Horsepower : 240 <br />Blade type : Semi-Universal <br /> Attachment no. 1 :ROPS Cab Shift basis: -1 per day <br /> Attachment no. 2 : NA <br /> Data source : (CRG) <br /> Utilization % _ <br />Cost Breakdown : Ownership cost/hour : $43.55 NA <br /> Operating cost/hour : $64.95 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $147.04 Total fleet cost/hour : $147.04 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,205 LCY factor : NA volume : 1,205 LCY <br />Source of estimate d volume :Previously accepted values <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 _ (avg.) <br />Average push distance : 50 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted hourly production : 1,022.9• LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) _ <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Loose stockpile Spoil pile: 0.80 (fnd-rt) <br /> Push gradient : 1.22 (Cat HB) <br />Average push gradient : 10.00 % (neg) Altitude : 1.00 --(Cat HB) <br />Average site altitude : 4,940 feet Material weight : 1.44 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 1,600 Ibs/LCY Net correction : 1.05 <br />Weight description <br />Top Soil Adjusted unit production : 1076.43 LCY/hr <br /> Adjusted fleet production : 1,076.43 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 1.12 Hours <br />Unit cost : $0.137 /LCY Total job cost : $165