Laserfiche WebLink
PART I <br />Page No. 16 <br />Permit No.: <br />.: CO-0000221 <br />The permittee may use the time for investigation to conduct a PTI or move directly into the TIE. A PTI consists of a <br />brief search for possible sources of WET, which might reveal causes of such toxicity and appropriate corrective actions <br />more simply and cost effectively than a formal TIE. If the PTI allows resolution of the WET incident, the TIE need not <br />necessarily be conducted. If, however, WET is not identified or resolved during the PTI, the TIE must be conducted <br />within the allowed 120 day time frame. <br />Any permittee that is required to conduct a PTI/TIE investigation shall do so in conformance with procedures identified <br />in the following documents, or as subsequently updated: 1) Toxicity Identification Evaluation: Characterization of <br />Chronically Toxic Effluents, Phase 1, EPA/600/6-91/005F May 92, 2) Methods for Aquatic Toxicity Identification <br />Evaluations Phase I Toxicity Characterization Procedures, EPA/600/6-91/003 Feb. 91 and 3) Methods for Aquatic <br />Toxicity Identification Evaluations Phase II Toxicity Identification Procedures, EPA/600/3-88/035 Feb. 1989. <br />A fourth document in this series is Methods for Aquatic Toxicity Identification Evaluations Phase III Toxicity <br />Confirmation Procedures, EPA/600/3-88/036 Feb. 1989. As indicated by the title, this procedure is intended to confirm <br />that the suspected toxicant is truly the toxicant. This investigation is optional. <br />Within 90 days of the determination of the toxicant or no later than 210 days after demonstration of toxicity, whichever is <br />sooner, a control program is to be developed and received by the Division. The program shall set down a method and <br />procedure for elimination of the toxicity to acceptable levels. <br />e. Request For Relief <br />The petmittee may request relief from further investigation and testing where the toxicant has or has not been determined <br />and the Division has determined suitable treatment does not appear possible. In requesting such relief, the permittee shall <br />submit material sufficient to establish the following: <br />i. It has complied with terms and conditions of the permit compliance schedule for the PTI/TIE investigation and other <br />appropriate conditions as may have been required by the Division; <br />ii. During the period of the toxicity incident it has been in compliance with all other permit conditions, including, in the <br />case of a POTW, pre-treatment requirements; <br />iii. During the period of the toxicity incident it has properly maintained and operated all facilities and systems of <br />treatment and control; and <br />iv. Despite the circumstances described in paragraphs i. and iii. above, the source and/or cause of toxicity could not be <br />located or resolved. <br />If deemed appropriate by the Division, the permit or the compliance schedule may be modified to revise the ongoing <br />monitoring and toxicity investigation requirements to avoid an unproductive expenditure of the permittee's resources, <br />provided that the underlying obligation to eliminate any continuing exceedance of the toxicity limit shall remain. <br />f. Spontaneous Disappearance <br />if toxicity spontaneously disappears at any time after a test failure, the permittee shall notify the Division in writing <br />within 14 days of a demonstration of disappearance of the toxicity. The Division may require the permittee to develop <br />and submit additional information which may include, but is not limited to, the results of additional testing. If no pattern <br />of toxicity is identified or recurring toxicity is not identified, the toxicity incident response is considered closed and <br />normal WET testing shall resume. <br />g. Toxicity Reovener <br />This permit may be reopened and modified (following proper administrative procedures) to include new compliance <br />dates, additional or modified numerical permit limitations, a new or different compliance schedule, a change in the whole <br />effluent toxicity testing protocol, or any other conditions related to the control of toxicants if one or more of the following <br />events occur: <br />i. Toxicity has been demonstrated in the effluent and the permit does not contain a toxicity limitation. <br />ii. The PTI/TIE results indicate that the toxicant(s) represent pollutant(s) that may be controlled with specific numerical <br />limits, and the Division agrees that the numerical controls are the most appropriate course of action.