Laserfiche WebLink
March 4, 2011 <br />2 <br />exempt permits be obtained prior to, the construction of these wells. Also, if any wells have <br />been completed without a valid MH Notice or well permit, the applicant will need to take <br />immediate action to either plug and abandon or permit the wells through the SEO. <br />If construction or operation activities of this project affect the flow of a stream or ditch we <br />recommend that the applicant consult with the local Water Commissioner. The local Water <br />Commissioner is Kathy Bower and may be reached at Kathy. Bower@state.co.us. <br />Thank you for the opportunity to comment on this project. If you have any questions, <br />please contact me at this office. <br />Sincerely, <br /> <br />KarlynAdams_ <br />Water Resource Engineer <br />KAA: Colowyo Collom Expansion C-1981-019(PR3).docx <br />cc: Erin Light, Division Engineer, Division 6 <br />Kathy Bower, Water Commissioner, District 44