Laserfiche WebLink
.Co <br />to <br />y <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />MINERALS PROGRAM INSPECTION REPORT lives <br />PHONE: (303) 866-3567 <br />Kr-CF- <br />MAR 0 7 201-1 <br />Division of Reclamation, <br />The Division of Reclamation, Mining and Safety has conducted an inspection of theTvpm njngdo tion <br />noted below. This report documents observations concerning compliance with the terms of the permit <br />and applicable rules and regulations of the Mined Land Reclamation Board. <br />MINE NAME: MINE/PROSPECTING ID#: MINERAL: COUNTY: <br />Ignacio Pit M-1992-054 Sand and gravel La Plata <br />INSPECTION TYPE: INSPECTOR(S): INSP. DATE: INSP. TIME: <br />Monitoring Kate A. Pickford February 18, 2011 13:00 <br />OPERATOR: OPERATOR REPRESENTATIVE: TYPE OF OPERATION: <br />LBCR, LLC Matt Carnahan 112c - Construction Regular Operation <br />REASON FOR INSPECTION: BOND CALCULATION TYPE: BOND AMOUNT: <br />Normal I&E Program Complete Bond $52,747.00 <br />DATE OF COMPLAINT: POST INSP. CONTACTS: JOINT INSP. AGENCY: <br />NA None None <br />WEATHER: INSPE R'S G T SIGNATURE DATE: <br />Clear February 25, 2011 <br />The following inspection topics were identified as having Problems or Possible Violations. OPERATORS <br />SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br />WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS. If a <br />Possible Violation is indicated, you will be notified under separate cover as to when the Mined Land <br />Reclamation Board will consider possible enforcement action. <br />INSPECTION TOPIC: Topsoil <br />PROBLEM/POSSIBLE VIOLATION: Problem: The topsoil stockpiles do not have established vegetation on them <br />and are therefore susceptible to erosion. Rule 3.1.9(1) states if topsoil is not replaced into the backfill area <br />within a time short enough to avoid deterioration of the topsoil, vegetative cover or other means shall be <br />employed so that the topsoil is protected from erosion. <br />CORRECTIVE ACTIONS: The operator shall seed the stockpiles with the seed mix that was submitted as part of <br />the approved Reclamation Plan. If no seed mix has been provided, the operator shall submit a seed mix for <br />approval as a technical revision to the permit along with the appropriate $216 revision fee to the Division by the <br />corrective action date. The'Operator shall demonstrate compliance by submitting seed tags, a bill of sale or <br />photographs of seeding activities. The Operator may also request a follow up inspection. <br />CORRECTIVE ACTION DUE DATE: 4/15/11 <br />Page 1 of 4