My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-07_REVISION - C1992080
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992080
>
2008-08-07_REVISION - C1992080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:19 PM
Creation date
3/3/2011 11:07:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080
IBM Index Class Name
REVISION
Doc Date
8/7/2008
Doc Name
Letter & Updated Reclamation Cost Estimate
From
DRMS
To
Savage & Savage
Type & Sequence
RN3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
erma t¢o_ C-92-080 <br />mi .came: Caton Junction Ming <br />TASK UST IDIRECT COSTS1 <br />Task no. Task description <br />Colorado Division of Reclamation, Mining and Safety Geology <br />Reclamation Cost Estimate <br />Prepared by: TK Dstr. G.8r18108 <br />P.mdt m lob .ti- Post Perrot. it Renewal RN-03 (corrected vaiues sho_yt in red1 <br />North oil <br />Finished, partially bond <br />Unfinished work or released work subject to <br />finished work yet to be 3.03(2) bond release phase <br />bond released limits <br />60% of <br />applicable <br />Form Task Cost (SL- amount for <br />Used Hours 03) SL-03 (S0 Cost(RN•OS) Hours Coat(RN-03) Hours <br />outside SL- <br />03 area) <br />001 Brag down-cast spoil from slope of N. Pit up to bench at N. Pit excavate 19.78 $2,762 <br />002 Cut spoil at base d North Pit scarp, then push to pit dozer 64.19 S13,373 <br />003 Move botndersicobbies on N. Pit bench to inside edged bench dozer 26.00 $5.417 <br />004 Haul fill from PRSA to North Pit truckfoader 88.51 $47,839 <br />005 Regrade North Pit fill to final contour dozer 121.13 $25,236 <br />006 Haut&spread topsoil fill & growth med-um fl t.s. pile 02 to N. Pit scraoer2 215.29 $43,321 <br />007 Final-grade topsoil un North Pit dozer 349.99 $72.709 <br />008 Revagetate North Pit ravage 16.70 56:333 <br />009 Construct 3 ponds TR-12 est. 18.00 $7:500 <br />010 Compact N. Pit fill (most fill Is topsoil with some blasted rock; compact 66.56 54,734 <br /> Applicable amount $229,224 5137.534 <br />North Pit haul road topsoil stockpile #2 and permanently reclaimed spo il area (PRSAi <br />012 Haul fill from PRSA to North Pit haul road truck/loader 11.06 $5.622 <br />013 Grade North Pit naulroad fill grader 7.10 $779 <br />014 Haul topsail from topsoil stockpile #2 to North Pit haul road scraps- 3.32 $2,409 <br />015 Regrade PRSA to final contour grader 3.48 $380 <br />016 Regrade topsoil stockpile #2 grader 2.07 $227 <br />017 Revegetate North Pit haul road, footprint at I. s. #2. PRSA revege 18.50 $9,417 <br /> 518,834 $11,300 <br />South oft drill pad <br />018 Regrade South Pit drill pad dozer 11.29 $2,353 <br />019 Haul topsoil from stockpile #2 to South PH drill pad area scraper2 6.39 $4,628 <br />020 Finish-grade South pit drill pad grader 22.69 $145 <br />021 Revegetate 3.5-acre South Pit drill pad revege 7.00 $2.655 <br /> $9;781 $5,869 <br />Carbon Junction Canyon channel <br />022 Regrade C.J. Cany. Channel N 1962' to 922' per TR-12 profile dozer 3.08 $042 <br />023a Excavate C.J. Canyon channel - hard digging excavate 30.88 54.000 <br />023b Excavate C.J. Channel - easy digging excavate 28.59 '93,992 <br />024 Purchase filter rock and rock nprap for C.J. charnel spreadsheet 24.00 579,882 <br />025 Install filter and nprap in C.J. Canyon channel excavate 173.00 $24,185 <br />026 Purchase culvert for C.J. Canyon channel road crossing rR-12 est. 800 $9,903 <br />027 Install culvert where channel crosses road TR-12 est. 24:-00 57,000 <br />028 Surveying TR-12 est 16.00 S4,500 <br /> 5134,104 $80.462 <br />Sedime nt pond #2 <br />031a Had topso^ for fill & reveg. V stockpile 97 to pond #2 trucriloader 2.7: ^. 57,259 87,259 27 -00 <br />031b Regrade pond 92 fill dozer 7.86 51,638 $1,638 7.86 <br />031c install riprap in drainage channet at pond 92 trucklioader 0.18 $39 50 30.00 <br />0310 Revegetate pond #1 renege 1.28 $1185 _ 5485 1.28 <br /> $9.421 so $9.382 75.14 <br />Sedirnetrt point #1 <br />037a Back; it pond Al >vHn topsoil I/ stockpile #8 scraper 2.a.16 tn'4i §10,409 18.16 <br />037b Re-grade pond #1 backfirl dozer 35.63 57,422 $7,422 36.63 <br />0372 Revegerate pond #1 renege 5.80 52,203 52,200 5.80 <br /> 530,031 30 .230,031 69.50 <br />$91.690 394.06 <br />$7,534 18.20 <br />$3,912 7.28 <br />553.642 123.02 <br />Page 1 of 2
The URL can be used to link to this page
Your browser does not support the video tag.