Laserfiche WebLink
Form Task RN-03 <br />Task no. Task description Used hours estimate <br />Sediment p <br />031 a ond #2 <br />Haul topsoil for fill & reveg. f/ stockpile #7 to pond #2 <br />truck loader <br />31.27 <br />$7,055 <br />031b Regrade pond #2 fill dozer 7.86 $1,400 <br />031 c Install riprap in drainage channel at pond #2 truck/loader 0.18 $600 <br />031d Revegetate pond #2 revege 1.28 $517 <br />Sediment p <br />037a ond #1 <br />Backfill pond #1 with topsoil f/ stockpile #8 <br />scraper <br />78.22 <br />$24,349 <br />037b Regrade pond #1 backfill dozer 35.63 $6,346 <br />037c Revegetate pond #1 revege 5.80 $2,341 <br />Equipment storage yard at south end of permit area <br />042 Remove/dispose equipment f/ equipment storage yard demolish.xis 123.50 $15,250 <br />043 Regrade equipment storage yard dozer 0.00 $0 <br />044 Distribute topsoil for fill & reveg. on equipment storage yard scraper 12.01 $3,214 <br />045 Revegetate equipment storage yard revege 4.60 $1,856 <br />052 Dispose of 25 55-gallon drums (6 w/ hazardous waste) demolish.xis 3.00 $4,989 <br />Topsoil stockpiles #4, V. and #8 <br />038 Haul remaining topsoil in stockpiles #4 and #7 into gravel pit area scraper 361.88 $96,891 <br />039 Disc footprints of stockpiles #4, #7, and #8 revege 4.00 $619 <br />041 Revegetate topsoil stockpiles #4, #7, and #8 revege 16.80 $6,780 <br />Seal monitoring wells <br />xls <br />borehole <br />8.63 <br />$4,101 <br />053 Seal three monitoring wells . <br />Equipment mobilization and long-term site maintenance <br />090 Mobilize/demobilize all equipment mobilize 4.62 $3,599 <br />050 Rill/gully maintenance, 3 times over 10 year period (Rule 3.02.1(7)) dozer 24.00 $1,358 <br />051 Weed control (4 hours each year X $50/hr X 10 years) NA 40.00 $2,000 <br /> TOTAL DIRECT COSTS 956.26 $235,714 <br />Page 2 of 3