My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-02-24_HYDROLOGY - M1978056
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1978056
>
2011-02-24_HYDROLOGY - M1978056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:31:11 PM
Creation date
3/2/2011 2:08:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978056
IBM Index Class Name
HYDROLOGY
Doc Date
2/24/2011
Doc Name
Substitute Water Supply Plan
From
OSE
To
Cheryl Signs Engineering
Permit Index Doc Type
Hydrology Report
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Division has identified four.epproachas for operators: <br />1. File a financial warranty thetwill ensure baddliilnt ofthe pit to cover the exposed pound water to a <br />depth of two feet above the static pound water level or, <br />2. Obtain a court approved augmentation plan prior to exposingground water or, <br />3. File a financial warranty to cover the cost of installing a day liner or slurry wall that meats the <br />Ohrislon of Water Resources requirements for preventing pound water exposure or, <br />4. Obteln approval from the Division of Water Resources 'that adtnowledges compliance with the SEtYs <br />requirements pursuant to 137-9(1-137(31).' <br />The Division will work with operators on on Indhrldual basis as they move to Implement one of these plans.. R <br />Is likely that options 1 and 3 will require the submittal of a technical mvislon or an amendment to the existing <br />permit depending on the nature of the parent minim and redsmstkm plan and the proposed changes. <br />Increased fnandal warrontlis, as a result of these modifications, may be posted in a phased manner not to <br />exceed tine yam Amendments or ralslons currently under review will be required to be approved by <br />April 30, 2011 and may use the phased financial warranty approach daicrlbed above. New appllcitions soft <br />forwird or presently under review bythe Division will be required to meet the requirements of one of the <br />options 1.4 at the time of appli adon•approval. Failure of effected operators to Initiate contact with the .• • *- <br />• Dlviiion ind iaTn.compliance as described above could result in an anforoement sedon belni issWd by.the: r. <br />D,hdslon. <br />If you have•any questions, please contactTony Wsildlen K 303866.3567, axtensipr 8150. <br />cc: Permit Id Site Name
The URL can be used to link to this page
Your browser does not support the video tag.