My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-02-28_ENFORCEMENT - M2004028
DRMS
>
Day Forward
>
Enforcement
>
Minerals
>
M2004028
>
2011-02-28_ENFORCEMENT - M2004028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:31:15 PM
Creation date
3/2/2011 2:07:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004028
IBM Index Class Name
ENFORCEMENT
Doc Date
2/28/2011
Doc Name
Finding of Fact, Conclusions of Law, and Order
From
DRMS
To
Febbraro Construction Company
Violation No.
MV2011004
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. The Operator affected 1.8 acres of land outside of the approved permit <br />boundary, and therefore failed to protect areas outside of the affected land from <br />slides or damages occurring during the mining and reclamation operation. <br />CONCLUSIONS OF LAW <br />6. The Board has jurisdiction over this matter pursuant to sections 34- <br />32.5-104 through 107, and 124 of the Colorado Land Reclamation Act for the <br />Extraction of Construction Materials, Article 32.5 of Title 34, C.R.S. (2010) ("Act"). <br />7. The Operator affected 1.8 acres of land outside of the permit boundary, <br />and therefore failed to protect areas outside of the affected land from slides or <br />damages occurring during the mining and reclamation operation, which is a <br />violation of section 34-32.5-116(4)(i), C.R.S. <br />8. Section 34-32.5-124(7), C.R.S. provides for a civil penalty of not less <br />than $100 per day nor more than $1,000 per day for each day during which a <br />violation occurs. The Board may impose a penalty based on 61 days of violation <br />(from the December 10, 2010 inspection to the February 9, 2011 hearing) at $100 to <br />$1,000 per day for a civil penalty of $6,100 to $61,000. <br />9. Pursuant to section 34-32.5-124(2), C.R.S., the Board may issue a <br />Cease and Desist Order if it determines that any provision of Article 32.5 of the Act <br />was violated. <br />ORDER <br />The Board finds the Operator in violation of section 34-32.5-116(4)(i), C.R.S., <br />for failing to protect areas outside of the affected land from slides or damages <br />occurring during the mining operation. <br />The Operator shall CEASE AND DESIST activities on lands outside of the <br />approved boundary until all corrective actions are completed. <br />The Board imposes against the Operator the following CORRECTIVE <br />ACTION: the Operator shall submit and receive approval of a conversion <br />application from the Division to increase the permit acreage to encompass the <br />current affected land. The conversion application must be submitted by May 12, <br />2011 and in an approvable form by August 11, 2011. <br />The Board imposes a CIVIL PENALTY for 61 days of violation at $100 per <br />day for a total civil penalty of $6,100. All but $100 of the penalty is suspended if the <br />Operator complies with the corrective action in the time specified. The portion of <br />the civil penalty not suspended, $100, shall be due and payable within 30 days of <br />this Order's signature date. <br />Febbraro Construction Co. <br />Broyles Pit, M-2004-028 <br />MV-2011-004 <br />2
The URL can be used to link to this page
Your browser does not support the video tag.