Laserfiche WebLink
FEB-24-2011 22:36 FROM:IRA PAULIN 7195376956 TO:DRMS P.4/8 <br />ORDER <br />Bated on the foregoing, the Board. hereby modifies the corrective action imposed <br />for MV-2010-028 in its November 17, 2010 order as follows: <br />1. The Operator must establish the correct permit boundary for M-1995-023 <br />and delineate the boundaries in accordance with Rule 3.1„12 of the <br />Mineral Rules and Regulations of the Colorado Mined Land Reclamation <br />Board for the Extraction of Construction Materials. <br />2, The Operator must submit and receive approval for a 110 Construction <br />Materials "Reclamation Only" application to permit and reclaim the <br />disturbed area outside of the approved permit boundary. The Operator <br />must submit the 110c application by June 14, 2011. <br />All other conditions a-od requirements of the Consent Agreement and the <br />November 17, 2010 Board Order for MV-2010-028 remain in full force and ef£ec:t. <br />DONE AND ORDERED this -Sy 'l.ay of 41d-,? 2011. <br />FOR THE COLORADO MINED LAND <br />RECLAMATION BOARD <br />Ira J. Paulin, C air <br />NOTICE OF APPEAL RIGHTS <br />This order becomes effective and finial upon mailing. Any party adversely affected <br />or aggrieved by agency action may commence an action for judicial review by filing <br />a notice of appeal with the district court within thirty (30) days after the effective <br />date of this order, pursuant to section 24-4.106, C.R.S. (2010). :(n the event that an <br />appeal is filed, designations of record made in accordance with section 24-4-106(6), <br />C.R.S. should be served on the Board at: 1313 Sherman Street, .Room 215, Denver, <br />CO 80203, Attention: Sitira Pope. <br />Corkle Construction <br />Corkle Pit, M-1995-023 2 <br />MV-2010-028