Laserfiche WebLink
Seneca 11-W - Phase / Bond Release (SL-3) 912112010 <br />Peabody Coal Co. to 912312010 <br />Permit Number: C-1982-057 Christy Hulsman <br />Seneca 1l-W - Phase I Bond Release (SL-3) 912112010 <br />Peabody Coal Co. to 912312010 <br />Permit Number: C-1982-057 Christy Hulsman <br /> <br />Fig. 9 - Haul Road "6z" and corridor. <br />t recr is regraded arrd stable. <br />Abundant thistle will need to <br />addressed before Phase 2 Bond <br />Release eligibility <br />r=ig. 10 - Channel below outlet of. <br />stoat. pond T-25 was heavily eroded <br />in the upper section. Section was <br />repaired by the end of the <br />inspection. <br />Page 9 of 14 <br />Seneca l1-W - Phase 1 Bond Release (SL-3) 912112010 <br />Peabody Coal Co. to 912312010 <br />Permit Number: C-1982-057 Christy Hulsman <br />.rye - <br />Fig. 11 - Repaired channel below <br />outlet of stock pored T-25. TRM Was <br />placed like shingles (overlapping <br />horizontal sections). <br />Page 10 of 14 <br />Seneca 11-W -Phase/ Bond Release (SL-3) 912112010 <br />Peabody Coal Co. to 912312010 <br />Permit Number: C-1982-057 Christy Hulsman <br />Fig. 12 - Haul road "I" & corridor <br />Page 11 of 14 Page 12 of 14