My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-01_REVISION - M1980244 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2011-03-01_REVISION - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:29 PM
Creation date
3/2/2011 6:56:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
3/1/2011
Doc Name
Power Pole Stability Analysis
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />iM-/ <br />Cripple Creek & Victor Gold Mining Company <br />A Joint Venture • ANGLOGOLD ASHANTI (COLORADO) CORP., Manager <br />Operations Office <br />P.O. Box 191 • 100 North 3'd Street <br />Victor, Colorado 80860 <br />(719) 689-2977 - Fax (7191689-3254 <br />SENT CERTIFIED, RETURN RECEIPT REQUESTED <br />7003-2260-0004-8082-6343 <br />February 24, 2011 <br />A`r. Berhan Keffelew <br />Senior Environmental Protection Specialist <br />Colorado Department of Natural Resources <br />Division of Reclamation, Mining and Safety <br />Office of Mined Land Reclamation <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />/W9 <br />RECEIVED <br />4fA'R 01 2011 <br />Division of Reclamation, <br />7-0 Mining & Safety <br />Reference: Cripple Creek & Victor Gold Mining Company, <br />Cresson Project Phase 5 Construction <br />Subject: AMEC Earth & Environmental, Inc. Power Pole Stability Analysi <br />Dear Mr. Keffelew: <br />Cripple Creek & Victor Gold Mining Company ("CC&V") is hereby providing the completed Power <br />Pole Stability Analysis report prepared by AMEC Earth & Environmental, Inc., for installation of the <br />power pole within the Phase 5 northern Toe Berm. As recommended in the analysis, the power pole will <br />be installed to a depth of 5' below the existing ground surface. <br />Should you have any questions, please do not hesitate to contact me at (719) 689-4055. <br />Sincerely, <br />Timm Comer <br />Manager, Environmental Resources <br />Enclosures: AMEC Power Pole Stability Analysis dated 22 February 2011.
The URL can be used to link to this page
Your browser does not support the video tag.