Laserfiche WebLink
Table 19. Surface Facilities List (conc.) <br />Slope structure <br />Topsoil stockpile areas <br />Transfer building <br />Transfer conveyor belt <br />Walkway tunnel <br />Post -law facilities constructed or permitted after August 3, 1977. <br />Acid tank <br />Antifreeze tanks urnp <br />Clean Coal Plant conveyor <br />Conveyor belt drive <br />Emergency escape hoist <br />Fuel tank containment sumps (2) <br />Hoist house, sheave <br />Mine dewatering pumps (2) <br />Raw coal conveyor belt <br />Raw coal reclaim tunnel <br />Refuse conveyor belt <br />Refuse disposal area <br />Silo loadout conveyor belt <br />Stacking tubes (2) <br />Subsoil storage stockpile <br />Thickener pump house <br />Thickener Tank <br />Wash plant <br />Phase I released <br />Warehouse #2 <br />Removed from site <br />Development coal waste pile <br />l3ectrical house <br />Loadout belt building <br />Rail car and refuse belt de -icer <br />Raw coal stockpile Areas #3 and 4 <br />Refuse disposal slurry lines (permitted but not constructed) <br />Sparge /VES remediation system <br />Transfer to loadout belt <br />Truck dump <br />Truck duty conveyor <br />Warehouse #3 Pad <br />Permanent <br />Garage (Ambulance bay) <br />Coal lab (NECCoffices) <br />River crossing culvert at main property entrance <br />River crossing foot bridge #2 <br />Map 12. Surface Facilities and Roads -West Portal <br />Facilities constructed priorAugust 3, 1977. <br />Fan shaft <br />Post -law facilities constructed or permitted afterAugust 3, 1977. <br />Bio- remediation storage site <br />Non -coal disposal area <br />Topsoil borrow area <br />West portal fan <br />Removed from site <br />Cap house <br />Core house <br />Garage /oil house <br />Hoist house <br />Powder house <br />Pump house <br />Warehouse #1 w /walkway tunnel <br />TR -54 Page 2.05 -6a Revised 12/10/10 <br />